Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Melbourne Airport Authority is soliciting sealed bids for the Northside Expansion Infrastructure Development at Melbourne Orlando International Airport, including clearing vegetation (except trees over 4" diameter except palms), grading a fence line, furnishing and installing 6,700 linear feet of 7' tall chain link fence with barbed wire, and three 16' single swing gates. A non-mandatory pre-bid site visit is allowed and a pre-bid meeting is scheduled for 2025-12-18 at 10:00 AM in the MAA Board Room. Bids open 2025-12-09 and are due 2026-01-20 at 2:00 PM Eastern (2026-01-20T19:00:00Z); the solicitation is an Invitation to Bid (not a grant) and is currently open.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking qualified firms to procure, install, and maintain Direct Current Fast Charging (DCFC) infrastructure at four City-owned sites as part of the federally funded EcoFleet ATL initiative. This project will replace seven internal combustion engine (ICE) vehicles with electric heavy-duty vehicles and deliver the necessary electric vehicle supply equipment (EVSE) infrastructure to support their operation. The initiative includes integration with the City¿s fleet management platform, workforce development, and emissions reduction tracking.
Posted Date
Dec 1, 2025
Due Date
Jan 9, 2026
Release: Dec 1, 2025
Close: Jan 9, 2026
Seeking qualified firms to procure, install, and maintain Direct Current Fast Charging (DCFC) infrastructure at four City-owned sites as part of the federally funded EcoFleet ATL initiative. This project will replace seven internal combustion engine (ICE) vehicles with electric heavy-duty vehicles and deliver the necessary electric vehicle supply equipment (EVSE) infrastructure to support their operation. The initiative includes integration with the City¿s fleet management platform, workforce development, and emissions reduction tracking.
AvailableProcurement of professional engineering services for sewer infrastructure expansion along Kiln DeLisle Road and Kapalama Drive.
Posted Date
Dec 18, 2025
Due Date
Jan 7, 2026
Release: Dec 18, 2025
Close: Jan 7, 2026
Procurement of professional engineering services for sewer infrastructure expansion along Kiln DeLisle Road and Kapalama Drive.
AvailableWork includes 1 LS of traffic control; 216 LF of 8-12" PVC sewer main; 7,463 LF of 10" C900 PVC force main; 5 EA of manhole structure; 1 LS of new lift station B- 55ft deep wet well, valve vault, and appurtenance; 115 LF of water main; 2,838 TN of aggregate base course; 87 TN of asphalt; 166 LF of storm sewer/ culvert.
Posted Date
Nov 25, 2025
Due Date
Dec 19, 2025
Release: Nov 25, 2025
Close: Dec 19, 2025
Work includes 1 LS of traffic control; 216 LF of 8-12" PVC sewer main; 7,463 LF of 10" C900 PVC force main; 5 EA of manhole structure; 1 LS of new lift station B- 55ft deep wet well, valve vault, and appurtenance; 115 LF of water main; 2,838 TN of aggregate base course; 87 TN of asphalt; 166 LF of storm sewer/ culvert.
AvailableWork consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.
Posted Date
Aug 18, 2025
Due Date
Jan 14, 2026
Release: Aug 18, 2025
Close: Jan 14, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.