Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Clark County is soliciting bids to replace chilled water pumps, chiller isolation valves, and condenser water strainers at the Regional Justice Center central plant, including associated hydronic piping, insulation, and structural modifications. The solicitation includes a pre-bid/site walk and will be opened via Webex; questions and attachments are available on the buyer’s posting (some documents require login to view).
Posted Date
Oct 8, 2025
Due Date
Apr 30, 2026
Release: Oct 8, 2025
Close: Apr 30, 2026
Clark County is soliciting bids to replace chilled water pumps, chiller isolation valves, and condenser water strainers at the Regional Justice Center central plant, including associated hydronic piping, insulation, and structural modifications. The solicitation includes a pre-bid/site walk and will be opened via Webex; questions and attachments are available on the buyer’s posting (some documents require login to view).
AvailableProvide chilled water pump, chiller valve & condenser water strainer replacement
Posted Date
Oct 8, 2025
Due Date
Dec 18, 2025
Release: Oct 8, 2025
Close: Dec 18, 2025
Provide chilled water pump, chiller valve & condenser water strainer replacement
AvailableThis Invitation for Bid (IFB) solicits contractors to remove and replace three chiller isolation valves, three primary chiller pumps, three secondary chiller pumps and associated hydronic piping, insulation, gauges, and condenser water t-strainer baskets at the Regional Justice Center central chiller plant. The scope also includes demolition and replacement work such as an overhead roll-up door, relocation of electrical conduit, and modification of light fixtures and mechanical ductwork; a pre-bid meeting and site walk are scheduled for October 15, 2025. Bids are due December 18, 2025, with bid opening to be held via Webex; documentation is hosted on the buyer-managed IonWave procurement site (link provided on the aggregator page).
Posted Date
Oct 8, 2025
Due Date
Dec 18, 2025
Release: Oct 8, 2025
Close: Dec 18, 2025
The Palm Beach County Water Utilities Department is soliciting a Construction Manager at Risk for the Water Treatment Plant No. 2 Expansion project, which includes expansion and hardening of the plant and construction of pre-treatment, membrane building, chemical systems, clearwell, air scrubbers, ground storage tanks, pumping systems, and electrical and instrumentation controls. The selected Construction Manager will provide pre-construction and construction services, develop a Guaranteed Maximum Price (GMP), manage publicly-bid trade contracts, and must demonstrate alternative delivery experience with a minimum prior project value of $60,000,000. The estimated project budget is $150,000,000$200,000,000, with construction expected to start June 2027 and complete April 2030.
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This Invitation for Bid (IFB) solicits contractors to remove and replace three chiller isolation valves, three primary chiller pumps, three secondary chiller pumps and associated hydronic piping, insulation, gauges, and condenser water t-strainer baskets at the Regional Justice Center central chiller plant. The scope also includes demolition and replacement work such as an overhead roll-up door, relocation of electrical conduit, and modification of light fixtures and mechanical ductwork; a pre-bid meeting and site walk are scheduled for October 15, 2025. Bids are due December 18, 2025, with bid opening to be held via Webex; documentation is hosted on the buyer-managed IonWave procurement site (link provided on the aggregator page).
The Palm Beach County Water Utilities Department is soliciting a Construction Manager at Risk for the Water Treatment Plant No. 2 Expansion project, which includes expansion and hardening of the plant and construction of pre-treatment, membrane building, chemical systems, clearwell, air scrubbers, ground storage tanks, pumping systems, and electrical and instrumentation controls. The selected Construction Manager will provide pre-construction and construction services, develop a Guaranteed Maximum Price (GMP), manage publicly-bid trade contracts, and must demonstrate alternative delivery experience with a minimum prior project value of $60,000,000. The estimated project budget is $150,000,000$200,000,000, with construction expected to start June 2027 and complete April 2030.