Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Village of Holmen
Work includes 1 LS of traffic control; 216 LF of 8-12" PVC sewer main; 7,463 LF of 10" C900 PVC force main; 5 EA of manhole structure; 1 LS of new lift station B- 55ft deep wet well, valve vault, and appurtenance; 115 LF of water main; 2,838 TN of aggregate base course; 87 TN of asphalt; 166 LF of storm sewer/ culvert.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Greeley
DESIGN/BUILD: interceptor, lift station, and force main.
Posted Date
Nov 10, 2025
Due Date
Dec 11, 2025
Release: Nov 10, 2025
City of Greeley
Close: Dec 11, 2025
DESIGN/BUILD: interceptor, lift station, and force main.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Lake Jackson
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Posted Date
Nov 23, 2025
Due Date
Jan 21, 2026
Release: Nov 23, 2025
City of Lake Jackson
Close: Jan 21, 2026
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
AvailableClark County Water Reclamation District (CCWRD)
The Clark County Water Reclamation District is soliciting bids for the Laughlin Lift Station No. 2 Force Main Rehabilitation project. The scope includes installing dual 16-inch HDPE force mains, a new flow meter vault, a surge tank, polymer concrete manholes, and rehabilitating approximately 4,800 linear feet of 21-inch gravity sewer via CIPP. The project has an estimated cost of $17.3M to $20.2M, requires mandatory site visits, and bidders must provide required bonds.
Posted Date
Oct 21, 2025
Due Date
Dec 11, 2025
Release: Oct 21, 2025
Clark County Water Reclamation District (CCWRD)
Close: Dec 11, 2025
The Clark County Water Reclamation District is soliciting bids for the Laughlin Lift Station No. 2 Force Main Rehabilitation project. The scope includes installing dual 16-inch HDPE force mains, a new flow meter vault, a surge tank, polymer concrete manholes, and rehabilitating approximately 4,800 linear feet of 21-inch gravity sewer via CIPP. The project has an estimated cost of $17.3M to $20.2M, requires mandatory site visits, and bidders must provide required bonds.
AvailableClark County Water Reclamation District (CCWRD)
Installation of dual 16" HDPE force mains totaling 22,600 LF of pipe; installation of new flow meter vault for the new force main; installation of new surge tank, approx. 500 LF of 60” steel casing with dual 16" carrier pipe; installation of new 60”, 72”, and 84” polymer concrete manholes and gravity sewer; rehabilitation of approx. 4,800 LF of 21" gravity sewer by cured-in-place pipe (CIPP); removal of existing diversion structure and replacement with new diversion structure and new bypass screening structure; and removal of approx. 11,300 LF of existing force main.
Posted Date
-
Due Date
Dec 11, 2025
Clark County Water Reclamation District (CCWRD)
Close: Dec 11, 2025
Installation of dual 16" HDPE force mains totaling 22,600 LF of pipe; installation of new flow meter vault for the new force main; installation of new surge tank, approx. 500 LF of 60” steel casing with dual 16" carrier pipe; installation of new 60”, 72”, and 84” polymer concrete manholes and gravity sewer; rehabilitation of approx. 4,800 LF of 21" gravity sewer by cured-in-place pipe (CIPP); removal of existing diversion structure and replacement with new diversion structure and new bypass screening structure; and removal of approx. 11,300 LF of existing force main.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →