Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consist of approx 1 LS bypass pumping; 1,602 SY remove concrete paving; 202 LF 6" concrete curb; 16,818 LF install temporary sediment fence; 1,934 LF 18" stainless steel cased force main via trenchless; 9,011 LF 18" force main via open-cut.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes demolition of existing duplex submersible lift station, construction of complete duplex submersible lift station, including wet well, valve, chamber, sanitary sewer, force main, bypass connection, permanent standby generator, pumps, piping, valves, electrical, controls, and instrumentation; demolition of six (6) existing control structures, demolition of sixteen (16) existing gates, demolition (removal or flow fill) of approx 1,940 LF of transfer piping, installation of six (6) control structures, installation of approx 2,060 LF of transfer piping, installation of nineteen (19) gate valves and one (1) slide gate in control structures. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 20, 2026
Release: Dec 17, 2025
Close: Jan 20, 2026
Work includes demolition of existing duplex submersible lift station, construction of complete duplex submersible lift station, including wet well, valve, chamber, sanitary sewer, force main, bypass connection, permanent standby generator, pumps, piping, valves, electrical, controls, and instrumentation; demolition of six (6) existing control structures, demolition of sixteen (16) existing gates, demolition (removal or flow fill) of approx 1,940 LF of transfer piping, installation of six (6) control structures, installation of approx 2,060 LF of transfer piping, installation of nineteen (19) gate valves and one (1) slide gate in control structures. See attached file.
AvailableInstallation of generator for lift station and wastewater treatment plant improvements.
Posted Date
Jan 7, 2026
Due Date
Jan 30, 2026
Release: Jan 7, 2026
Close: Jan 30, 2026
Installation of generator for lift station and wastewater treatment plant improvements.
AvailableReplacement of equipment at four (4) existing wastewater lift stations, referred to as Wastewater Lift Stations 17, 51, 52, and 53. This includes to: Removal and replacement of pumping equipment, piping, valves, and appurtenances within existing dry wells/lift stations; installation and operation of temporary bypass pumping; removal of existing seal water systems; removal and replacement of the WWLS 51 above ground fuel storage tank; and modifications to the electrical and control systems related to the equipment replacement.
Posted Date
Sep 10, 2025
Due Date
Jan 29, 2026
Release: Sep 10, 2025
Close: Jan 29, 2026
Replacement of equipment at four (4) existing wastewater lift stations, referred to as Wastewater Lift Stations 17, 51, 52, and 53. This includes to: Removal and replacement of pumping equipment, piping, valves, and appurtenances within existing dry wells/lift stations; installation and operation of temporary bypass pumping; removal of existing seal water systems; removal and replacement of the WWLS 51 above ground fuel storage tank; and modifications to the electrical and control systems related to the equipment replacement.
AvailableWork includes wastewater system improvements.
Posted Date
Dec 16, 2025
Due Date
Jan 20, 2026
Release: Dec 16, 2025
Close: Jan 20, 2026
Work includes wastewater system improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis