Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of equipment at four (4) existing wastewater lift stations, referred to as Wastewater Lift Stations 17, 51, 52, and 53. This includes to: Removal and replacement of pumping equipment, piping, valves, and appurtenances within existing dry wells/lift stations; installation and operation of temporary bypass pumping; removal of existing seal water systems; removal and replacement of the WWLS 51 above ground fuel storage tank; and modifications to the electrical and control systems related to the equipment replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Phase II for HVAC upgrades at various schools throughout the school system.
Posted Date
Oct 24, 2025
Due Date
Jan 29, 2026
Release: Oct 24, 2025
Close: Jan 29, 2026
Phase II for HVAC upgrades at various schools throughout the school system.
AvailableWork includes construction of lift station improvements.
Posted Date
Dec 16, 2025
Due Date
Jan 19, 2026
Release: Dec 16, 2025
Close: Jan 19, 2026
Work includes construction of lift station improvements.
AvailableLift station modifications & pump improvements. Emergency generator and new concrete slab. Electrical and SCADA upgrades.
Posted Date
Dec 7, 2025
Due Date
Jan 20, 2026
Release: Dec 7, 2025
Close: Jan 20, 2026
Lift station modifications & pump improvements. Emergency generator and new concrete slab. Electrical and SCADA upgrades.
AvailableInstallation of approx. 9,600 LF of 24" force main, installation of 220 feet of 30" steel casing pipe by jack and bore, the upgrade of five (5) existing lift stations, construction one large lift station, installation of about 5,600 LF of 4" force main, re-directing the force main of one small lift station, plus cleaning and CCTV of about 14,200 LF of 8" and 10" sewer in the Reo sewer shed, rehabilitation or replacement of select sewer sections and manholes, and all other work
Posted Date
Jan 7, 2026
Due Date
Feb 12, 2026
Release: Jan 7, 2026
Close: Feb 12, 2026
Installation of approx. 9,600 LF of 24" force main, installation of 220 feet of 30" steel casing pipe by jack and bore, the upgrade of five (5) existing lift stations, construction one large lift station, installation of about 5,600 LF of 4" force main, re-directing the force main of one small lift station, plus cleaning and CCTV of about 14,200 LF of 8" and 10" sewer in the Reo sewer shed, rehabilitation or replacement of select sewer sections and manholes, and all other work
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis