Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Lift station modifications & pump improvements. Emergency generator and new concrete slab. Electrical and SCADA upgrades.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Lift station upgrades work includes installing sanitary sewer system/lift station removing the park's septic tanks.
Posted Date
Jan 21, 2026
Due Date
Feb 24, 2026
Release: Jan 21, 2026
Close: Feb 24, 2026
Lift station upgrades work includes installing sanitary sewer system/lift station removing the park's septic tanks.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project will consist of upgrades to the existing lift station at the West Jessamine High School site. The upgrades will include replacement of (1) existing manhole with new manhole, reconnection of existing sanitary lines to manhole, replacement of the existing 4" sanitary pipe from manhole to wet well of lift station with new 8" sanitary from manhole to wet well, providing new data rack, new control integration of lift station pump system to district Building Automation System, and installation of new storm drainage consisting of new storm drain outlets, piping, trenching, and patching of asphalt drive.
Posted Date
Sep 26, 2025
Due Date
Feb 12, 2026
Release: Sep 26, 2025
Close: Feb 12, 2026
The project will consist of upgrades to the existing lift station at the West Jessamine High School site. The upgrades will include replacement of (1) existing manhole with new manhole, reconnection of existing sanitary lines to manhole, replacement of the existing 4" sanitary pipe from manhole to wet well of lift station with new 8" sanitary from manhole to wet well, providing new data rack, new control integration of lift station pump system to district Building Automation System, and installation of new storm drainage consisting of new storm drain outlets, piping, trenching, and patching of asphalt drive.
AvailableReplacement of equipment at four (4) existing wastewater lift stations, referred to as Wastewater Lift Stations 17, 51, 52, and 53. This includes to: Removal and replacement of pumping equipment, piping, valves, and appurtenances within existing dry wells/lift stations; installation and operation of temporary bypass pumping; removal of existing seal water systems; removal and replacement of the WWLS 51 above ground fuel storage tank; and modifications to the electrical and control systems related to the equipment replacement.
Posted Date
Sep 10, 2025
Due Date
Jan 29, 2026
Release: Sep 10, 2025
Close: Jan 29, 2026
Replacement of equipment at four (4) existing wastewater lift stations, referred to as Wastewater Lift Stations 17, 51, 52, and 53. This includes to: Removal and replacement of pumping equipment, piping, valves, and appurtenances within existing dry wells/lift stations; installation and operation of temporary bypass pumping; removal of existing seal water systems; removal and replacement of the WWLS 51 above ground fuel storage tank; and modifications to the electrical and control systems related to the equipment replacement.
AvailableWork includes relocating the existing generator and installing a new backup pump, a new generator and relocating and installing pump, a new package pump station and overflow vaults, and new overflow vaults and a new flow meter. Work also includes electrical and controls upgrades, structural modifications, and wet well improvements.
Posted Date
Dec 9, 2025
Due Date
Feb 18, 2026
Release: Dec 9, 2025
Close: Feb 18, 2026
Work includes relocating the existing generator and installing a new backup pump, a new generator and relocating and installing pump, a new package pump station and overflow vaults, and new overflow vaults and a new flow meter. Work also includes electrical and controls upgrades, structural modifications, and wet well improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →