Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition of existing duplex submersible lift station, construction of complete duplex submersible lift station, including wet well, valve, chamber, sanitary sewer, force main, bypass connection, permanent standby generator, pumps, piping, valves, electrical, controls, and instrumentation; demolition of six (6) existing control structures, demolition of sixteen (16) existing gates, demolition (removal or flow fill) of approx 1,940 LF of transfer piping, installation of six (6) control structures, installation of approx 2,060 LF of transfer piping, installation of nineteen (19) gate valves and one (1) slide gate in control structures. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Installation of generator for lift station and wastewater treatment plant improvements.
Posted Date
Jan 7, 2026
Due Date
Jan 30, 2026
Release: Jan 7, 2026
Close: Jan 30, 2026
Installation of generator for lift station and wastewater treatment plant improvements.
AvailableConstruction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
Posted Date
Dec 5, 2025
Due Date
Feb 19, 2026
Release: Dec 5, 2025
Close: Feb 19, 2026
Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
Scope of project: wastewater treatment plant rehabilitation including cleaning, blasting and recoating of existing on-site lift station wet well, piping, valves, and all appurtenances; bypass pumping; repair of cracks on walls of aeration basins, digester basins, clarifiers and chlorine contact basins, replacement of various valves at basins and piping; installation on site bathroom and appurtenances, rehabilitation of influent manhole and off site lift station rehabilitation including cleaning, blasting and recoating of existing lift station wet well, piping, valves, manhole and electrical improvements.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Scope of project: wastewater treatment plant rehabilitation including cleaning, blasting and recoating of existing on-site lift station wet well, piping, valves, and all appurtenances; bypass pumping; repair of cracks on walls of aeration basins, digester basins, clarifiers and chlorine contact basins, replacement of various valves at basins and piping; installation on site bathroom and appurtenances, rehabilitation of influent manhole and off site lift station rehabilitation including cleaning, blasting and recoating of existing lift station wet well, piping, valves, manhole and electrical improvements.
This RFP is for the procurement of sewer system improvements, specifically for the construction of a New Wastewater Treatment Plant.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
This RFP is for the procurement of sewer system improvements, specifically for the construction of a New Wastewater Treatment Plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis