North Street Sewer Separation
Work includes approx 700 SF additional sidewalk replacement; 500 LF additional CIPP; 10 EA tree removal; 300 CY rock removal; 20 EA reinstate sanitary sewer service connections.
Description: Quotes are requested for the following areas of work: asphalt/stone products pavement marking, traffic signage castings/precast supplies, concrete curb & sidewalk pipe supplies, pipelining & geopolymer mortar trucking.
City · NY, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityNY
Posted
Jul 30, 2026
Sep 24, 2026
Work includes approx 700 SF additional sidewalk replacement; 500 LF additional CIPP; 10 EA tree removal; 300 CY rock removal; 20 EA reinstate sanitary sewer service connections.
Posted
Sep 3, 2026
Oct 19, 2026
Provide Air Separation Module, NSN 1R-3655-017002793-P8, REF NR 2170105-101, QTY 24 Ea
CityME
Posted
Sep 3, 2026
Oct 21, 2026
Work includes approx 4,000 LF of 8” sanitary sewer; 14 EA of pre-cast manholes; 1,600 LF of 4" and 6" sanitary sewer services, including all materials, equipment, and labor to conduct project pipe installation, traffic control, excavation, backfill, compaction, trench paving, erosion control and all other work required for complete project.
CityPA
Posted
Sep 4, 2026
Oct 15, 2026
Installation of new storm sewer pipe, inlets and manholes; clearing and grubbing; traffic control; resident notification; erosion and sedimentation control measures; existing utility protection; street reconstruction; existing concrete curb, gutter, sidewalk and handicap ramp replacement; bituminous milling and overlay; and miscellaneous site restoration, complete in place.