Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide street improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This Request for Proposals (RFP) is for the North Street Sewer Improvements project, which includes installation of CIPP lining, manhole rehabilitation, and pump station removal. The solicitation is issued by the City of Brandon and is funded by a CDBG-PF GRANT. Bids are due by January 26, 2026, and full solicitation documents are available on the Central Bidding platform, requiring registration for access.
Posted Date
Dec 22, 2025
Due Date
Jan 26, 2026
Release: Dec 22, 2025
Close: Jan 26, 2026
This Request for Proposals (RFP) is for the North Street Sewer Improvements project, which includes installation of CIPP lining, manhole rehabilitation, and pump station removal. The solicitation is issued by the City of Brandon and is funded by a CDBG-PF GRANT. Bids are due by January 26, 2026, and full solicitation documents are available on the Central Bidding platform, requiring registration for access.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Comprehensive street and utility improvements, including asphalt milling and overlay, full-depth asphalt replacement, and curb and sidewalk replacement. Additional work includes stormwater system upgrades such as new inlets and drainage structure replacements. The project also includes the installation of a new 8" water main with associated valves, fittings, and service reconnections.
Posted Date
Nov 5, 2025
Due Date
Jan 15, 2026
Release: Nov 5, 2025
Close: Jan 15, 2026
Comprehensive street and utility improvements, including asphalt milling and overlay, full-depth asphalt replacement, and curb and sidewalk replacement. Additional work includes stormwater system upgrades such as new inlets and drainage structure replacements. The project also includes the installation of a new 8" water main with associated valves, fittings, and service reconnections.
AvailableThe major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
Posted Date
Oct 29, 2025
Due Date
Jan 15, 2026
Release: Oct 29, 2025
Close: Jan 15, 2026
The major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
AvailableRealignment of street, drainage, curb ramps, sidewalks, curbing, paving, and other miscellaneous road work.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Realignment of street, drainage, curb ramps, sidewalks, curbing, paving, and other miscellaneous road work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →