School DistrictNJ
May 1, 2026
Closes
Oct 15, 2026
Renovation and Upgrade To JFK Natatorium *REBID*
Renovation and Upgrade To Natatorium.
Description: Interior and exterior renovation of the apartments. The Harding Apartments consist of a three-story masonry structure with Level 1 concrete floor slab, Level 2 & 3 wood floor joists and wood truss roof. It is approximately twenty-six feet (26') from grade to the roof edge at the east, west, and south facades. The main entrance is located at the east elevation and accessed via a sidewalk from South Harding Avenue. There are currently 18 residential units, 6 per floor, accessed from a new enclosed interior stair from the primary entrance and a new rear stair.
SpecialDistrict · IL, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
School DistrictNJ
May 1, 2026
Closes
Oct 15, 2026
Renovation and Upgrade To Natatorium.
Wisconsin Department of Administration
State AgencyWI
Apr 13, 2026
Closes
Aug 26, 2026
In general, the work consists of: a comprehensive renovation of 356,335 GSF including a Phase 1 renovation of 70,090 GSF of space in select areas on the Basement, Ground, 1st, 2nd, 3rd, 4th, 5th and 6th Floors and a Phase 2 renovation of 286,245 GSF of space on the Basement, Ground, 1st , 2nd , 3rd , 4th, 5th, 6th, 7th and Penthouse. The scope of work also includes demolition of an existing building entrance and construction of a new entrance, asphalt work on site, concrete sidewalk, curb and gutter work on site, demolition of an existing concrete vault in an existing parking lot and demolition and reconstruction of a concrete retaining wall.
Higher EducationSC
Jul 30, 2026
Closes
Aug 26, 2026
Construction Management at Risk services for hall renovation will: add humidity control and waterproofing at select building foundation/basement, balance the existing HVAC system, re-lamp existing light fixtures, upgrade lighting controls, make existing elevator upgrades, install a new natural gas boiler system, install a new fire alarm system, include testing (allowance) for a BDA system, and address accessibility of restroom.
Special DistrictMO
Jul 22, 2026
Closes
Aug 27, 2026
Renovation of the entire development, including new concrete walkways, new asphalt shingle roofing, a new elevator, and electrical service upgrades. The one-bedroom apartment units will be renovated, including new flooring, wall finishes, PTACS, furnaces, and electrical work.
Procurement and program contacts connected to Chicago Housing Authority.