Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract a consists of the installation of approx., 2,050 LF of 6" C900 PVC DR14 waterline and appurtenances including valves, fire hydrant installation, water service line re-connections, and all temporary and permanent surface restoration including lawn, concrete sidewalk, and all necessary appurtenances and restoration for said construction. Contract b consists of roadway surface restoration and paving. The work includes milling of 3,500 SY of existing pavement, placement of 150 TN of 3/4" scratch, paving of 3,500 SY of 9.5mm wearing course (1. 5" depth), base repair, and all necessary traffic control and driveway access, and all necessary appurtenances and restoration for said construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of the waterline replacement project.
Posted Date
Dec 5, 2025
Due Date
Dec 30, 2025
Release: Dec 5, 2025
Close: Dec 30, 2025
Construction of the waterline replacement project.
AvailableThe approximate quantities for the principal items of work under this contract are: 1847 LF - 6" c-900, PVC water main; 105 LF - 6" hdpe pipe (dr11) (directional bore); 520 LF - 3/4" service line; 380 LF - 2" PVC encasement (bored); 16 each - water service reconnection (complete in place); 2 each - tie-in to existing water system; 4 each - 6" gate valve with box; 4 each - fire hydrant assembly (complete); 100 lf - saw cut pavement/driveways (variable depth); 125 SY - remove and replace asphalt pavement (crush stone); 100 SY - remove and replace concrete drive; 50 Y - remove and replace concrete sidewalk; 100 SY - remove and replace concrete curb & gutter; 100 SY - borrow excavation (class 9) (fm); 0.25 acres - seeding and mulching; 1 each - 6" tapping sleeve and valve with box; 7 each - tree removal, all sizes.
Posted Date
Aug 1, 2025
Due Date
Jan 13, 2026
Release: Aug 1, 2025
Close: Jan 13, 2026
The approximate quantities for the principal items of work under this contract are: 1847 LF - 6" c-900, PVC water main; 105 LF - 6" hdpe pipe (dr11) (directional bore); 520 LF - 3/4" service line; 380 LF - 2" PVC encasement (bored); 16 each - water service reconnection (complete in place); 2 each - tie-in to existing water system; 4 each - 6" gate valve with box; 4 each - fire hydrant assembly (complete); 100 lf - saw cut pavement/driveways (variable depth); 125 SY - remove and replace asphalt pavement (crush stone); 100 SY - remove and replace concrete drive; 50 Y - remove and replace concrete sidewalk; 100 SY - remove and replace concrete curb & gutter; 100 SY - borrow excavation (class 9) (fm); 0.25 acres - seeding and mulching; 1 each - 6" tapping sleeve and valve with box; 7 each - tree removal, all sizes.
Replacing approx. 1000 LF of underground steam and pumped condensate lines and four new steam pits. Steam and pumped condensate laterals to Champion Hall, Science Building, and CPS will be upgraded. Install approx. 1200 LF of primary and signal duct bank along side existing duct bank distribution system. Extend existing underground chilled water distribution system for approx. 900 LF, upgrade chilled water lateral to CPS.
Posted Date
Oct 6, 2025
Due Date
Jan 29, 2026
Release: Oct 6, 2025
Close: Jan 29, 2026
Replacing approx. 1000 LF of underground steam and pumped condensate lines and four new steam pits. Steam and pumped condensate laterals to Champion Hall, Science Building, and CPS will be upgraded. Install approx. 1200 LF of primary and signal duct bank along side existing duct bank distribution system. Extend existing underground chilled water distribution system for approx. 900 LF, upgrade chilled water lateral to CPS.
Work consists of mechanical, electrical, plumbing, and fire protection (MEP).
Posted Date
Oct 6, 2025
Due Date
Jan 14, 2026
Release: Oct 6, 2025
Close: Jan 14, 2026
Work consists of mechanical, electrical, plumbing, and fire protection (MEP).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis