Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Iowa Department of Administrative Services is soliciting proposals to replace Air Handling Units (AHUs) and condensers for Units A and B at the North Central Correctional Facility to improve HVAC reliability and maintain secure, humane conditions. The contractor will provide full replacement work including engineering, specifications, and compliance with applicable codes; period of performance is to commence upon award and complete by February 13, 2026. Proposals are due February 13, 2026 and were posted January 19, 2026; estimated project value is approximately $500,000$1,500,000.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replace AHU B102. Work includes general construction, alterations, necessary removal and replacement of air handling units, piping, fittings, and heads. Includes electrical work, controls integration, and ducting, Landscaping and floor repairs as necessary.
Posted Date
Jan 14, 2026
Due Date
Mar 11, 2026
Release: Jan 14, 2026
Close: Mar 11, 2026
Replace AHU B102. Work includes general construction, alterations, necessary removal and replacement of air handling units, piping, fittings, and heads. Includes electrical work, controls integration, and ducting, Landscaping and floor repairs as necessary.
AvailableThe State of Iowa Department of Administrative Services (DAS) is soliciting professional design services to remove and replace existing wood windows in the Educational Building at the North Central Correctional Facility. The selected firm will provide design deliverables including construction drawings and specifications, coordinate with the State Historic Preservation Office, and provide construction administration over an estimated 240-day project. The solicitation identifies required proposal contents (qualifications, approach, schedule, fee) and reserves the States rights to accept, reject, or negotiate proposals.
Posted Date
Jan 21, 2026
Due Date
Feb 13, 2026
Release: Jan 21, 2026
Close: Feb 13, 2026
The State of Iowa Department of Administrative Services (DAS) is soliciting professional design services to remove and replace existing wood windows in the Educational Building at the North Central Correctional Facility. The selected firm will provide design deliverables including construction drawings and specifications, coordinate with the State Historic Preservation Office, and provide construction administration over an estimated 240-day project. The solicitation identifies required proposal contents (qualifications, approach, schedule, fee) and reserves the States rights to accept, reject, or negotiate proposals.
Air handling unit (AHU) replacement.
Posted Date
Jan 14, 2026
Due Date
Feb 20, 2026
Release: Jan 14, 2026
Close: Feb 20, 2026
Air handling unit (AHU) replacement.
AvailableWork includes replace chilled water coils, supply fan motors and return fan motors and will convert existing pneumatic to ddc controls. The motors, drives and controls are accessible from the mechanical room next to the air handling unit. The chilled water coils on the ground floor are accessible through the same mechanical room. The chilled water coils on floors 1 through 3 are accessible through the outside air louvers.
Posted Date
Jan 19, 2026
Due Date
Feb 24, 2026
Release: Jan 19, 2026
Close: Feb 24, 2026
Work includes replace chilled water coils, supply fan motors and return fan motors and will convert existing pneumatic to ddc controls. The motors, drives and controls are accessible from the mechanical room next to the air handling unit. The chilled water coils on the ground floor are accessible through the same mechanical room. The chilled water coils on floors 1 through 3 are accessible through the outside air louvers.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis