Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Air handling unit (AHU) replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide an air handling unit replacement.
Posted Date
Jan 7, 2026
Due Date
Feb 19, 2026
Release: Jan 7, 2026
Close: Feb 19, 2026
Provide an air handling unit replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the removal of eight air handling units and replacing them with six air handling units. Hot water heating piping will be modified to accommodate the AHU replacement.
Posted Date
Jan 13, 2026
Due Date
Jan 29, 2026
Release: Jan 13, 2026
Close: Jan 29, 2026
Project includes the removal of eight air handling units and replacing them with six air handling units. Hot water heating piping will be modified to accommodate the AHU replacement.
AvailableThe existing multi-zone air handling unit (AHU) and condensing unit serving cottage of the intermediate care facility is to be replaced with new single-zone split systems. The existing mechanical pit is to be expanded to accommodate the new HVAC equipment. The existing switch and fuse distribution panelboard serving the HVAC equipment is to be replaced with a new circuit breaker distribution panelboard.
Posted Date
Oct 29, 2025
Due Date
Feb 5, 2026
Release: Oct 29, 2025
Close: Feb 5, 2026
The existing multi-zone air handling unit (AHU) and condensing unit serving cottage of the intermediate care facility is to be replaced with new single-zone split systems. The existing mechanical pit is to be expanded to accommodate the new HVAC equipment. The existing switch and fuse distribution panelboard serving the HVAC equipment is to be replaced with a new circuit breaker distribution panelboard.
AvailableThe project consists of the replacement of AHU-1B at the UAB Highlands facility. The scope of work includes mechanical demolition and new work, as well as associated architectural and electrical modifications as required to facilitate the equipment replacement.
Posted Date
Dec 3, 2025
Due Date
Jan 29, 2026
Release: Dec 3, 2025
Close: Jan 29, 2026
The project consists of the replacement of AHU-1B at the UAB Highlands facility. The scope of work includes mechanical demolition and new work, as well as associated architectural and electrical modifications as required to facilitate the equipment replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →