Retrieving RFP details
Release
Close
City of Austin
The work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of cured-in-place-pipe (cipp) linings and manhole rehabilitations. 3,775 lf of 8" cipp lining, 657 lf 12" cipp lining, and 205 lvf (12 total manholes) of manhole rehabilitation. 2,042 lf 15" cipp lining, 492 lf 16" cipp lining, and 137 lvf (10 total manholes) of manhole rehabilitation. 612 lf 15" cipp lining, 2,188 16" cipp lining, and 67 lvf (7 total manholes) of manhole rehabilitation. See attached files.
City of Austin
Water system renewal on merion cir, newport ln, langwood dr, and barons ct. This project is part of austin water s efforts to replace aging and deteriorated water infrastructure.
City of Austin
Wastewater improvements includes existing 8-inch, 10-inch and 12-inch wastewater pipe near Cameron Road and Capital Plaza has a very high risk of overflows because it does not have enough capacity for current wastewater flows.
City of Austin
Renewal of approximately 13,000 LF of water line in the area bounded by Loyola Ln (south), Johnny Morris (west), and Colony Loop (east). This project is part of Austin Water’s efforts to replace aging and deteriorated pipeline infrastructure.
City of Craig
One (1) Trailer Mounted Diesel Powered Wastewater Pump.
Release
Jan 06, 2025
Close
Feb 13, 2025