Summary
Lateral CIPP. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: Mobilization, Field engineering and surveying, Locating existing utilities, Preparation of submittals, Site preparatory activities including acquisition of necessary permits or notifications, Installation of temporary facilities required to stage the work, Implementation of traffic control, if necessary, CCTV inspection, Temporary bypass pumping (if required), Sewer Cleaning, Cured in Place Pipe Lining, Miscellaneous work, restoration, and cleanup, Demobilization, Project closeout, All other Work necessary to complete the work and as indicated in the Contract Documents.