Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Manistee County Road Commission
Work includes 36" CIPP culvert relining by UV cure or Resin-Impregnated Tube; 18" CIPP culvert relining by UV cure or Resin-Impregnated Tube; 18" CIPP culvert relining by UV cure or Resin-Impregnated Tube; 24" CIPP culvert relining by UV cure; 71 LF of 36" concrete pipe - culvert; 63 LF of 18" concrete pipe - culvert; 60 LF of 18" cmp - culvert; 75' of 24" cmp - culvert.
Posted Date
Jun 25, 2026
Due Date
Jul 6, 2026
Release: Jun 25, 2026
Manistee County Road Commission
Close: Jul 6, 2026
Work includes 36" CIPP culvert relining by UV cure or Resin-Impregnated Tube; 18" CIPP culvert relining by UV cure or Resin-Impregnated Tube; 18" CIPP culvert relining by UV cure or Resin-Impregnated Tube; 24" CIPP culvert relining by UV cure; 71 LF of 36" concrete pipe - culvert; 63 LF of 18" concrete pipe - culvert; 60 LF of 18" cmp - culvert; 75' of 24" cmp - culvert.
AvailableManistee County Road Commission
Work involves the placement of 2" hma, 4e1 overlay on road from the existing joint west of us-31 to the existing joint of road. The existing roadway is 30' wide, consisting of 2 - 11' lanes and 2- 4' shoulders. The road paving will be placed on a new chipseal interlayer. See attached file.
Posted Date
Jun 9, 2026
Due Date
Jun 17, 2026
Release: Jun 9, 2026
Manistee County Road Commission
Close: Jun 17, 2026
Work involves the placement of 2" hma, 4e1 overlay on road from the existing joint west of us-31 to the existing joint of road. The existing roadway is 30' wide, consisting of 2 - 11' lanes and 2- 4' shoulders. The road paving will be placed on a new chipseal interlayer. See attached file.
Manistee County Road Commission
Provide replacement of existing air conditioner unit. Work shall also include but is not limited to the following: all related electrical work and materials to connect to the existing safety switch box. All related piping work and materials to connect to the existing piping. Removal and replacement of the existing evaporator coil with a new evaporator coil compatible with the new ac unit. Disposal of the existing air conditioner unit, evaporator coil, and related items.
Posted Date
Apr 25, 2026
Due Date
May 11, 2026
Release: Apr 25, 2026
Manistee County Road Commission
Close: May 11, 2026
Provide replacement of existing air conditioner unit. Work shall also include but is not limited to the following: all related electrical work and materials to connect to the existing safety switch box. All related piping work and materials to connect to the existing piping. Removal and replacement of the existing evaporator coil with a new evaporator coil compatible with the new ac unit. Disposal of the existing air conditioner unit, evaporator coil, and related items.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge