Work consist of 5 EA of removing single tree, 5 EA of removing stump, 10 CY of removing existing structural concrete, 2 EA of removing existing manhole or catch basin, 220 SY of removing pavement surface, 2,100 CY of common excavation, 25 CY of structural earth excavation - drainage and minor structures, below grade, 1,650 CY of aggregate sub-base course - gravel, 120 TON of hot mix asphalt 12.5 mm HMA surface, 180 TON of hot mix asphalt 9. 5 mm (sidewalks, drives, incidentals).
bulk
zip
Release
Oct 02, 2024
Close
Oct 23, 2024