Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD: bridge replacement project involving the removal and replacement of an existing single-span bridge over the tuscarawas river on snyder avenue, including 12" waterline relocation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
DESIGN-BUILD: bridge replacement project involving the removal and replacement of an existing single-span bridge over the tuscarawas river on snyder avenue, including 12" waterline relocation.
Posted Date
Jan 16, 2026
Due Date
Feb 26, 2026
Release: Jan 16, 2026
Close: Feb 26, 2026
DESIGN-BUILD: bridge replacement project involving the removal and replacement of an existing single-span bridge over the tuscarawas river on snyder avenue, including 12" waterline relocation.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD: Bridge replacement of the superstructure and rehabilitation of the substructure of bridge 10.
Posted Date
Jan 16, 2026
Due Date
Mar 3, 2026
Release: Jan 16, 2026
Close: Mar 3, 2026
DESIGN-BUILD: Bridge replacement of the superstructure and rehabilitation of the substructure of bridge 10.
AvailableDESIGN-BUILD: 1 LS clearing and grubbing; 36 CY excavation of subgrade; 36 CY granular material, type b; 1 LS special - guardrail; 1 LS permanent erosion control; 1 LS special - drainage; 1 LS special - signs and supports; 1 LS special - pavement marking; 1 LS special - sealing of concrete.
Posted Date
Dec 12, 2025
Due Date
Feb 12, 2026
Release: Dec 12, 2025
Close: Feb 12, 2026
DESIGN-BUILD: 1 LS clearing and grubbing; 36 CY excavation of subgrade; 36 CY granular material, type b; 1 LS special - guardrail; 1 LS permanent erosion control; 1 LS special - drainage; 1 LS special - signs and supports; 1 LS special - pavement marking; 1 LS special - sealing of concrete.
AvailableDESIGN/BUILD: Providing design-build services for the construction of baseball/softball complex upgrades.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
DESIGN/BUILD: Providing design-build services for the construction of baseball/softball complex upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →