Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD: 1 LS clearing and grubbing; 36 CY excavation of subgrade; 36 CY granular material, type b; 1 LS special - guardrail; 1 LS permanent erosion control; 1 LS special - drainage; 1 LS special - signs and supports; 1 LS special - pavement marking; 1 LS special - sealing of concrete.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Bridge design-build project.
Posted Date
Dec 17, 2025
Due Date
Dec 29, 2025
Release: Dec 17, 2025
Close: Dec 29, 2025
Bridge design-build project.
AvailablePremium
Access the largest public sector contact database
Pedestrian bridge design, build, operate, and transfer project. See attached file.
Posted Date
Nov 25, 2025
Due Date
Dec 22, 2025
Release: Nov 25, 2025
Close: Dec 22, 2025
Pedestrian bridge design, build, operate, and transfer project. See attached file.
AvailableProcuring design and construction services for a new 1,441-foot-long, 55-foot-wide bridge along SR 25/US 17/SR 99/N. Walton Street at the Darien River in McIntosh County, Georgia.
Posted Date
Dec 18, 2025
Due Date
Aug 27, 2026
Release: Dec 18, 2025
Close: Aug 27, 2026
Procuring design and construction services for a new 1,441-foot-long, 55-foot-wide bridge along SR 25/US 17/SR 99/N. Walton Street at the Darien River in McIntosh County, Georgia.
AvailableDesign-Build: Provide design build for the boulevard beach approach and restroom replacement.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Design-Build: Provide design build for the boulevard beach approach and restroom replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis