CityOK
Jul 29, 2026
Closes
Sep 4, 2026
Arterial Street Rehabilitation E. Pine St. N. & N. Peoria Ave. Intersection
Work includes clearing and grubbing, 7419 CY unclassified excavation, 403 SY solid slab sodding, 1451 CY aggregate base type A, 165 SY subgrade method B, 5658 SY separator fabric, 198 LF combined curb and gutter (6" barrier), 585 SY concrete sidewalk (4"), 154 SY decorative concrete sidewalk (4"), 425 SY 4" concrete dividing strip. See attached file.