South Valley Water Reclamation Facility
Special DistrictUT
Posted
Jul 31, 2026
Sep 16, 2026
Headworks Screenings and Grit Dumpsters
Supply of two headworks screenings and grit dumpsters.
Description: The International Boundary and Water Commission is soliciting a combined synopsis/solicitation for the purchase and installation of OEM-specific headworks equipment at the Nogales International Wastewater Treatment Plant in Rio Rico, Arizona. The requirement includes a Mensch severe-duty bar screen, Vulcan washing presses, ESR fine screens, associated controls and wear parts, plus removal, installation, testing, commissioning, training, and manuals. This is a sole-source, brand-name federal procurement for OEM-authorized sources, with quotations due September 18, 2026, at 3:00 p.m. MDT; it is not a grant program.
Federal · TX, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
South Valley Water Reclamation Facility
Special DistrictUT
Posted
Jul 31, 2026
Sep 16, 2026
Supply of two headworks screenings and grit dumpsters.
CityFL
Posted
Aug 7, 2026
Sep 23, 2026
Work includes removal and replacement of the existing headworks system, site piping, and electrical system; construction of new headworks system, platform walkway and stairs, piping modifications, site work demolition, dewatering, concrete support, concrete pad, electrical, instrumentation and controls; replacement of existing ras/was pumps, installation of an influent flow meter and variable frequency drives for the pump; installation of sludge holding tank jet mixing system, piping modifications, concrete support, concrete pad.
Posted
Aug 21, 2026
Sep 18, 2026
The INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO is soliciting one complete Hach wastewater process instrumentation package for the Nogales International Wastewater Treatment Plant. The requirement includes genuine Hach equipment together with installation, integration, startup, calibration, testing, training, warranty activation, documentation, and final turnover. The official SAM.gov page identifies this as an active contract solicitation, not a grant, with responses due September 18, 2026 at 3:00 pm MDT.
Mobile Area Water & Sewer System
Special DistrictAL
Posted
-
Sep 14, 2026
Project consists of williams headworks rehabilitation and odor control.
Decision makers connected to this RFP from International Boundary And Water Commission: U.S.-Mexico.