Truckee Meadows Water Authority
Special DistrictNV
Posted
Sep 15, 2026
Oct 6, 2026
Pagni 2 Well and Zolezzi 3 Well Construction and Testing RFP
Work includes drill, construct, develop, and test pump two (2) production wells via the dual-tube air flooded reverse drilling method employing concentric dual-wall drill pipe. The wells will be constructed of stainless-steel casing and screen, glass beads, and range from 10 inches I.D. to 14 inches I.D. And 250 ft. to 530 ft. In depth.
