Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of the construction of one (1) backup well, installation of a new well water supply pump, electrical upgrades, site security fencing, and site restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of a contractor for the construction of a new water production well.
Posted Date
Dec 19, 2025
Due Date
Jan 22, 2026
Release: Dec 19, 2025
Close: Jan 22, 2026
Procurement of a contractor for the construction of a new water production well.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procure estimated costs for drilling contracting services. Bid proposal is to replace two type 1 wells (well #9 & well #10).
Posted Date
Dec 29, 2025
Due Date
Jan 26, 2026
Release: Dec 29, 2025
Close: Jan 26, 2026
Procure estimated costs for drilling contracting services. Bid proposal is to replace two type 1 wells (well #9 & well #10).
AvailableProject will entail executing the following tasks on all three (3) well water pumps at TCEC: 1. Remove the existing above ground well water piping and equipment and store the designated parts for reuse. 2. Fabricate new well water piping and set aside to be coated. Supplier will be responsible for supplying pipe, fittings, bolting, and u-bolts. Coating to be handled by FMPA. 3. Install new piping and equipment without damaging coating. 4. Demo and installation work will be performed one well at a time so as not to impede operations or fire protection
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Project will entail executing the following tasks on all three (3) well water pumps at TCEC: 1. Remove the existing above ground well water piping and equipment and store the designated parts for reuse. 2. Fabricate new well water piping and set aside to be coated. Supplier will be responsible for supplying pipe, fittings, bolting, and u-bolts. Coating to be handled by FMPA. 3. Install new piping and equipment without damaging coating. 4. Demo and installation work will be performed one well at a time so as not to impede operations or fire protection
Work includes construction of water well pump replacement.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Work includes construction of water well pump replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →