Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procure estimated costs for drilling contracting services. Bid proposal is to replace two type 1 wells (well #9 & well #10).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Rehabilitation of SW wells 4 and 10 in the southwest wellfield and well 57 well pump inspections, repairs, and replacements for sw wells 4 and 10, well 57, and horse farm well. Building, site, and electrical improvements for sw wells 4 & 10 and well 57.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
Rehabilitation of SW wells 4 and 10 in the southwest wellfield and well 57 well pump inspections, repairs, and replacements for sw wells 4 and 10, well 57, and horse farm well. Building, site, and electrical improvements for sw wells 4 & 10 and well 57.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the following Work: Construction, test pumping, and sampling of an 18-inch diameter potable municipal sandstone well. Construction of 70-foot x 52-foot water treatment building with cast-in-place concrete foundation and floors, masonry walls, concrete plank ceiling and membrane roof; buried cast-in-place concrete detention tank; FRP and hollow metal doors and frames; louvers; plumbing; heating; ventilation; painting; interior and exterior lighting; electrical; process instrumentation and control; supervisory control and data acquisition (SCADA) system improvements; standby generator and automatic transfer switch; vertical turbine well pump, vertical turbine high lift pumps; process mechanical piping, valves, flowmeters, and appurtenances. Site work including 14-inch diameter water main and valves; 8-inch diameter sanitary sewer piping and associated manholes; two (2) 12,000-gallon nominal capacity buried precast concrete backwash detention tanks; site grading; concrete stoops and sidewalk; aggregate base course and asphalt pavement for driveway and parking areas; removal and reinstallation of existing chain link fence; erosion control; street restoration; and site restoration. All work shall be awarded under a single contract. Treatment equipment will be bid out in a separate bid package (Phase 2) after well construction has been completed. The anticipated substantial completion date is August 2027, and final completion date is May 2028.
Posted Date
Dec 23, 2025
Due Date
Jan 21, 2026
Release: Dec 23, 2025
Close: Jan 21, 2026
Project includes the following Work: Construction, test pumping, and sampling of an 18-inch diameter potable municipal sandstone well. Construction of 70-foot x 52-foot water treatment building with cast-in-place concrete foundation and floors, masonry walls, concrete plank ceiling and membrane roof; buried cast-in-place concrete detention tank; FRP and hollow metal doors and frames; louvers; plumbing; heating; ventilation; painting; interior and exterior lighting; electrical; process instrumentation and control; supervisory control and data acquisition (SCADA) system improvements; standby generator and automatic transfer switch; vertical turbine well pump, vertical turbine high lift pumps; process mechanical piping, valves, flowmeters, and appurtenances. Site work including 14-inch diameter water main and valves; 8-inch diameter sanitary sewer piping and associated manholes; two (2) 12,000-gallon nominal capacity buried precast concrete backwash detention tanks; site grading; concrete stoops and sidewalk; aggregate base course and asphalt pavement for driveway and parking areas; removal and reinstallation of existing chain link fence; erosion control; street restoration; and site restoration. All work shall be awarded under a single contract. Treatment equipment will be bid out in a separate bid package (Phase 2) after well construction has been completed. The anticipated substantial completion date is August 2027, and final completion date is May 2028.
AvailableThe project includes approx. the construct 14 new domestic wells, install PE water service lines, complete electrical appurtenances, and accompanying constant pressure systems. Abandon existing wells when applicable (8). Investigate 1 domestic well and rehabilitate. Abandon 4 existing wells, including 1 flowing well and 1 chamber well. All work shall be done in accordance with the Technical Provisions and drawings attached. See outside link for more details. All drilling activities must take place outside of May 1st-August 15th. Tree removal can only take place with written pre-authorization from the engineer.
Posted Date
Jan 7, 2026
Due Date
Jan 30, 2026
Release: Jan 7, 2026
Close: Jan 30, 2026
The project includes approx. the construct 14 new domestic wells, install PE water service lines, complete electrical appurtenances, and accompanying constant pressure systems. Abandon existing wells when applicable (8). Investigate 1 domestic well and rehabilitate. Abandon 4 existing wells, including 1 flowing well and 1 chamber well. All work shall be done in accordance with the Technical Provisions and drawings attached. See outside link for more details. All drilling activities must take place outside of May 1st-August 15th. Tree removal can only take place with written pre-authorization from the engineer.
AvailableSeeking bids from qualified vendors to provide rehabilitation services for selected groundwater wells within the city's public water supply system, with the goal of improving well performance and increasing water supply capacity. Also includes 110 HR of chemical well cleaning and treatment solution insertion (per hour); 5 EA of 2,000 gal. settling tank with baffles; see outside link.
Posted Date
Dec 26, 2025
Due Date
Jan 29, 2026
Release: Dec 26, 2025
Close: Jan 29, 2026
Seeking bids from qualified vendors to provide rehabilitation services for selected groundwater wells within the city's public water supply system, with the goal of improving well performance and increasing water supply capacity. Also includes 110 HR of chemical well cleaning and treatment solution insertion (per hour); 5 EA of 2,000 gal. settling tank with baffles; see outside link.