Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation of SW wells 4 and 10 in the southwest wellfield and well 57 well pump inspections, repairs, and replacements for sw wells 4 and 10, well 57, and horse farm well. Building, site, and electrical improvements for sw wells 4 & 10 and well 57.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Metropolis is soliciting bids for the construction of municipal water well improvements, including the installation of a new well and upgrades to two existing well vaults. The project requires furnishing all labor, materials, and equipment necessary for the installation and associated piping work. This procurement is expected to be funded in part by a grant from the Environmental Protection Agency and is subject to federal procurement requirements.
Posted Date
Jan 29, 2026
Due Date
Mar 17, 2026
Release: Jan 29, 2026
Close: Mar 17, 2026
The City of Metropolis is soliciting bids for the construction of municipal water well improvements, including the installation of a new well and upgrades to two existing well vaults. The project requires furnishing all labor, materials, and equipment necessary for the installation and associated piping work. This procurement is expected to be funded in part by a grant from the Environmental Protection Agency and is subject to federal procurement requirements.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition of the majority of interior of the well house site, piping and the vertical turbine pump and pump motor. The new work will include 8" ductile iron piping, new 8" magnetic flow meter, a 2" air relief valve, a 10" vertical turbine pump and a pump motor, and electrical improvements.
Posted Date
Jan 30, 2026
Due Date
Feb 25, 2026
Release: Jan 30, 2026
Close: Feb 25, 2026
Work includes demolition of the majority of interior of the well house site, piping and the vertical turbine pump and pump motor. The new work will include 8" ductile iron piping, new 8" magnetic flow meter, a 2" air relief valve, a 10" vertical turbine pump and a pump motor, and electrical improvements.
AvailableDemolition of existing CMU building, including concrete and foundation, CIP; Remove existing plumbing, electrical, and mechanical inside well building, coordinate with City on disposal, CIP; Pre-fabricated FRP building (6 feet by 6 feet), including heating and ventilation; 77 SF Concrete foundation for new building.
Posted Date
Jan 29, 2026
Due Date
Mar 13, 2026
Release: Jan 29, 2026
Close: Mar 13, 2026
Demolition of existing CMU building, including concrete and foundation, CIP; Remove existing plumbing, electrical, and mechanical inside well building, coordinate with City on disposal, CIP; Pre-fabricated FRP building (6 feet by 6 feet), including heating and ventilation; 77 SF Concrete foundation for new building.
AvailableWell #6 Well House Rehabilitation. The Project generally includes: the rehabilitation of the well, the installation of an emergency power source (backup generator), building upgrades, electrical upgrades, general site work, the installation of a concrete loading dock, the supply and installation of new valves, piping, and chemical feed equipment, as well as associated equipment and appurtenances.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Well #6 Well House Rehabilitation. The Project generally includes: the rehabilitation of the well, the installation of an emergency power source (backup generator), building upgrades, electrical upgrades, general site work, the installation of a concrete loading dock, the supply and installation of new valves, piping, and chemical feed equipment, as well as associated equipment and appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →