Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide installation of a new standing seam metal roof system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project includes installing new PVC membrane over an existing metal roof system of approx. 3,130 SF. An alternate bid includes removing and replacing existing standing seam metal roof with new Standing seam metal roof.
Posted Date
Nov 14, 2025
Due Date
Jan 13, 2026
Release: Nov 14, 2025
Close: Jan 13, 2026
Project includes installing new PVC membrane over an existing metal roof system of approx. 3,130 SF. An alternate bid includes removing and replacing existing standing seam metal roof with new Standing seam metal roof.
AvailablePremium
Access the largest public sector contact database
The base bid consists of the installation of a new PVC membrane over the existing metal roof system of approx. 3,130 SF. Alternate Bid 1 is to remove and replace existing standing seam metal roof with new standing seam metal roof.
Posted Date
Nov 24, 2025
Due Date
Jan 13, 2026
Release: Nov 24, 2025
Close: Jan 13, 2026
The base bid consists of the installation of a new PVC membrane over the existing metal roof system of approx. 3,130 SF. Alternate Bid 1 is to remove and replace existing standing seam metal roof with new standing seam metal roof.
AvailableWork includes : removal and replacement of the entire standing seam metal roof.
Posted Date
Sep 11, 2025
Due Date
Jan 6, 2026
Release: Sep 11, 2025
Close: Jan 6, 2026
Work includes : removal and replacement of the entire standing seam metal roof.
AvailableRemoval and replacement of existing modified bitumen roof systems for approximately 179 squares. Roof replacement includes roof deck repairs, base sheet system, insulation system, and a modified bitumen roof system. Roof repairs includes repairs on existing standing seam metal roof areas.
Posted Date
Nov 18, 2025
Due Date
Jan 8, 2026
Release: Nov 18, 2025
Close: Jan 8, 2026
Removal and replacement of existing modified bitumen roof systems for approximately 179 squares. Roof replacement includes roof deck repairs, base sheet system, insulation system, and a modified bitumen roof system. Roof repairs includes repairs on existing standing seam metal roof areas.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis