Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Milford Borough (Pike County, Pennsylvania) is soliciting proposals to remove an existing exposed‑fastener metal roof and install a new, solar‑ready standing seam metal roof system on the Department of Public Works garage. The opportunity opened on January 28, 2026, and submissions are due via the PennBid portal by February 11, 2026 at 4:00 PM EST. The scope includes demolition, material supply, and installation of a watertight standing seam system with associated trims and flashings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project consists of approx. 8,100 SF of new roofing. New roofing is to be 24 gauge with a standing mechanical seam. Ridge, eave, rake trim, gutters, downspouts, chimney flashing, roof jacks, and other necessary components shall be included. Existing standing seam metal roof (snaplock style), and all trim, gutters downspouts, flashing, and necessary components are to be removed.
Posted Date
Jan 6, 2026
Due Date
Feb 12, 2026
Release: Jan 6, 2026
Close: Feb 12, 2026
The project consists of approx. 8,100 SF of new roofing. New roofing is to be 24 gauge with a standing mechanical seam. Ridge, eave, rake trim, gutters, downspouts, chimney flashing, roof jacks, and other necessary components shall be included. Existing standing seam metal roof (snaplock style), and all trim, gutters downspouts, flashing, and necessary components are to be removed.
AvailableClose: Feb 12, 2026
Work consists of metal roof replacement.
AvailableRemoval of asphalt shingles and installation of standing seam metal roof with ridge venting. Rough roof dimensions are 64' X 36'.
Posted Date
Jan 23, 2026
Due Date
Feb 24, 2026
Release: Jan 23, 2026
Close: Feb 24, 2026
Removal of asphalt shingles and installation of standing seam metal roof with ridge venting. Rough roof dimensions are 64' X 36'.
AvailableThis RFP is for the replacement of the roof at Elk Ridge Middle School, including the removal of existing roof membrane and partial removal of insulation, and replacement with new single-ply membrane.
Posted Date
-
Due Date
Feb 19, 2026
Close: Feb 19, 2026
This RFP is for the replacement of the roof at Elk Ridge Middle School, including the removal of existing roof membrane and partial removal of insulation, and replacement with new single-ply membrane.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis