University Of North Carolina At Chapel Hill
Higher EducationNC
Posted
-
Oct 22, 2026
New Residence Hall 1 - Full Building Round 1-Package 23a HVAC RFP
Project consists of package 23a HVAC.
Description: The project is two new five-story residence halls totaling approximately 174,000 square feet and 734 beds, with demolition of the existing Jackson Hall and site utility updates. The Round 2 bid includes package 06x, Solid Surface Shower Enclosures, alongside other prequalified subcontractor packages. The invitation seeks labor, materials, and equipment, and states that bids will not be accepted after 1:00 p.m. on November 11, 2026.
HigherEducation · NC, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
University Of North Carolina At Chapel Hill
Higher EducationNC
Posted
-
Oct 22, 2026
Project consists of package 23a HVAC.
Wisconsin Department of Administration
State AgencyWI
Posted
Oct 6, 2026
Nov 5, 2026
In general, the work consists of: renovations to provide building code, accessibility, life safety and building system infrastructure upgrades throughout the Kronshage, Jorns, and Humphrey student residences (11 buildings, approximately 182,300 SF building area). This project also creates new facility amenities for resident gathering gathering spaces, kitchenettes, study spaces, and restroom configuration improvements in select locations. New elevators in three of these buildings will increase the number of accessible resident rooms in Kronshage Hall significantly. Project work includes but is not limited to replacing the steam heating system with a new hot water system; providing air conditioning to resident rooms, common spaces, required technical spaces, and office spaces; mechanically ventilating resident rooms and common spaces; upgrading and augmenting the fire alarm and smoke detection systems to meet current code requirements; and installing a new fire suppression system.
University of North Texas System
Higher EducationTX
Posted
-
Dec 31, 2099
Procurement for the development and construction of a Residence Hall and Innovation Center.
Higher EducationIA
Posted
Mar 31, 2026
Nov 12, 2026
Work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements.
Decision makers connected to this RFP from University Of North Carolina At Chapel Hill.