CityMA
Posted
Aug 31, 2026
Sep 24, 2026
IFb #27-05 - Market St. Complete Streets Improvements Project in Amesbury
Market St. complete streets improvements project.
Description: The project involves the pavement rehabilitation including the following elements within the 3,900 FT of project length: Mill and overlay of existing pavement (removal of bituminous concrete pavement to the underlying concrete pavement). Replacement of two existing traffic control signals with all new equipment at the Talcott Road and Oakwood Avenue intersections. Minor revisions to the existing New Britain Avenue intersection traffic signal equipment. Implementation of a two-way separated bicycle lane facility along the west side of New Park Avenue between New Britain Avenue and Talcott Road. Installation of a multi-use path sidewalk, between Talcott Road and project limit north of Oakwood Avenue. Implementation of additional pavement markings and barriers with flexible bollard posts separating the bicycle facility from the through traffic lane. Restriping New Park Avenue to provide a road diet cross section with a center two way left turn lane. Upgrading existing bus stops with new proprietary floating bus stop platforms and sidewalk connections at two locations. Retaining most of the curbing along both sides of roadway. Retaining all existing storm drainage facilities with replacement of catch basin tops and sections of pipe. Replacement of existing sidewalk slabs where shown on plans while retaining most of existing sidewalk. Replacing the existing hardscape surfaces between the curbing and sidewalks along both sides of roadway. Installing street light appurtenances along both sides of roadway as shown. Installing landscaped raised pedestrian refuge islands and median islands as shown. Replacing trees where noted Retaining existing utility infrastructure except where noted on plans. Installing all new signs.
City · CT, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMA
Posted
Aug 31, 2026
Sep 24, 2026
Market St. complete streets improvements project.
CityCA
Posted
Aug 27, 2026
Sep 23, 2026
City of Bell Gardens posted a BID for ATP Cycle 6-Bell Gardens Complete Streets Improvements, Phase 2 (CIP number 3938). The official record lists a start date of 08/27/2026 and a close date of 09/23/2026 at 11:00 AM; the current listing marks it NEW!, with the close date after 2026-08-29. The item is labeled as a bid rather than an ATP grant-program announcement, and no retrievable primary PDF, DOC, or PPT URL or additional scope description was available in the source record.
CityTX
Posted
Aug 28, 2026
Sep 24, 2026
Work includes locating existing utilities, removing brush and trees smaller than 6", removing asphalt detour pavement or temporary asphalt pavement, adjusting water valve stacks, meters, removing valves and fittings, substituting 5" of non-reinforced concrete for the asphalt detours, concrete curb is incidental to concrete pavement, field adjusting locations of taps, connections, manholes, junction boxes, driveways, ramps, sidewalks, signs, and other miscellaneous appurtenances, painting of steel railings, repairs to driveways, fences, walls, landscaping, irrigation and other private property. See outside link.
CityFL
Posted
-
Sep 9, 2026
Work includes approx 1 LS dewatering; 267 CY regular excavation; 255 SY 2" milling exist asphalt pavement; 548 SY 4" concrete sidewalk and driveways; 140 LF of conduit, directional bore.
Decision makers connected to this RFP from Town of West Hartford.