Closing soon

New Office Construction (185 King-3rd Floor-Legal Services)

Description: See B3 for Site Investigation. D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of but not limited to; D2.2 General Requirements The General Contractor shall provide all labour, materials, equipment, supervision, permits, coordination, and incidentals required to complete the office renovation in accordance with the Issued for Construction (IFC) drawings, specifications, applicable codes, and City of Winnipeg requirements. Applicable IFC Drawings/Drawing Description A01 Demolition and Renovation Plan A02 Reflected Ceiling Plan A03 Finish Plan E1 Electrical Demolition and Renovation E2 Electrical Specifications M1 Mechanical Demolition/Renovation, Legend and Specifications The work generally includes selective demolition, construction of three new offices (Rooms 346A, 346B, and 346C), modifications to File Room 347, mechanical, electrical and sprinkler modifications, ceiling work, painting, and interior finishing. D2.3 Site Preparation and Protection a) Verify existing site conditions and dimensions before construction. b) Coordinate site access, schedules, and building operations with the Contract Administrator. c) Install temporary hoarding and dust containment, including minimum 6-mil polyethylene protection. d) Protect all existing finishes, furniture, equipment, and building components to remain. e) Maintain safe access and minimize disruption to building occupants. f) Perform designated above-ceiling work after regular business hours in accordance with asbestos requirements. D2.4 Selective Demolition a) Remove and retain existing shelving, doors, hardware, and other components designated for reuse. b) Remove existing wall sections, wall coverings, corner guards, and wall base as indicated. c) Modify ceiling grids and remove tiles as required. d) Remove and relocate affected mechanical, electrical, sprinkler, and building components. e) Remove and dispose of demolition debris in accordance with applicable regulations. D2.5 New Office Construction a) Construct three new offices (346A, 346B, and 346C) within existing File Room 346. b) Install new steel-stud partitions with sound insulation, resilient channels, and 5/8-inch gypsum board. c) Provide required framing, headers, blocking, and supports. d) Supply and install three solid-core oak doors with frames, hardware, and tempered smoked-glass sidelites matching existing finishes. e) Reinstall designated existing doors, hardware, and accessories. D2.6 File Room 347 Modifications a) Reinstall existing shelving in accordance with the revised layout. b) Provide required blocking, anchors, and supports. c) Reinstall the existing door and hardware. d) Complete all associated patching, painting, and finishing. D2.7 Mechanical and Sprinkler Work a) Relocate existing supply air diffusers, return air grilles, ductwork, and associated components. b) Supply and install new diffusers and grilles where indicated. c) Relocate and install sprinkler heads and modify piping as required. d) Coordinate all installations with the revised ceiling and partition layouts. e) Complete testing, inspections, and air balancing, including submission of reports. D2.8 Electrical Work a) Relocate existing electrical services and components as required. b) Supply and install new lighting fixtures, switches, receptacles, and data outlets. c) Modify wiring, conduits, and connections to suit the new office layout. d) Test all new and modified electrical installations. e) Coordinate required shutdowns with the Contract Administrator. D2.9 Ceiling and Interior Finishes a) Modify existing ceiling grids and install new ceiling tiles where required. b) Coordinate ceiling installations with lighting, mechanical, and sprinkler systems. c) Supply and install wall base, blinds, wood trim, and associated finishes. d) Prepare and paint designated walls in accordance with the approved finish schedule. e) Repair and restore all surfaces affected by construction to match existing finishes. D2.10 Doors and Hardware a) Supply and install all specified door hardware, including hinges, locksets, gasketing, automatic door bottoms, and door bumpers. b) Provide construction cylinders compatible with the City's permanent core system. c) Coordinate permanent lock core installation with the City's locksmith. d) Submit hardware shop drawings and product information for approval. D2.11 Asbestos and Hazardous Materials a) Asbestos or other hazardous materials are to be handled by the Bidder/to hire a qualified Asbestos Abatement Contractor in accordance to the provided specifications in E1.4 which includes but not limited to Hazardous Materials – General Provisions (02 81 00), Asbestos Abatement – Type 2 (Moderate Risk) Precautions (02 82 11) and the Asbestos Risk Assessment provided by the Consultant (Pinchin). b) The Bidder must not include the cost of abatement monitoring consultant in the Tender as per the City protocol. The City must hire the abatement/monitoring consultant. That said, the monitoring cost includes interim/daily/final inspections and air sampling, is subject to the Bidder’s schedule of all, and any work above the ceiling tiles. This will include electrical, data, sprinkler, ductwork/diffuser/ HVAC etc., as well as the abatement contractor work. Since the abatement consultant monitoring is directly affected by the Bidder’s schedule of work above the ceiling tiles, the Bidder should inform the contract administrator of any changes to schedule. c) Maintain appropriate containment and protective measures. D2.12 Permits, Inspections and Code Compliance a) Obtain and pay for all required permits and inspection fees. b) Comply with applicable building, fire, electrical, mechanical, and safety codes. c) Provide required fire stopping and sealing at penetrations through fire-rated assemblies. d) Coordinate and complete all required inspections. D2.13 Testing, Cleaning and Project Closeout ) Test and commission all new and modified building systems. b) Verify proper operation of doors, hardware, electrical, mechanical, and sprinkler installations. c) Correct deficiencies identified during inspections. d) Remove construction debris and temporary facilities and thoroughly clean the renovated areas. e) Submit warranties, operation and maintenance manuals, inspection reports, and closeout documentation. f) Provide a minimum one-year warranty and turn over the completed areas in clean, safe, and operational condition. D2.14 General Contractor Responsibilities a) Manage and coordinate all subcontractors and construction trades. b) Coordinate architectural, mechanical, electrical, and sprinkler work. c) Submit shop drawings, product data, and samples for approval. d) Coordinate construction schedules, site access, and service shutdowns. e) Maintain site safety, cleanliness, and protection of existing facilities. f) Report unforeseen conditions and obtain approval before implementing changes. g) Ensure all work meets the drawings, specifications, and City requirements. D2.15 General Conditions a) Verify all existing conditions and dimensions before commencing work. b) Provide new materials unless otherwise specified for reuse. c) Follow manufacturer installation requirements and applicable specifications. d) Report discrepancies between drawings, specifications, and site conditions before proceeding. e) Obtain written approval for substitutions or changes. f) Complete all work to the satisfaction of the City of Winnipeg Contract Administrator. g) Construction schedule: Establish project duration and completion date. h) Working hours: Identify regular and mandatory after-hours work. See more

Buyer
Winnipeg

City · MB, CA

Released
Nov 9, 2026
Closes
Nov 27, 2026(11 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts