Special DistrictNY
Posted
Sep 5, 2026
Nov 6, 2026
Construct a New Fire Station RFP
Construct a new fire station of approx. 10,664 SF with associated site work. four (4) bid packages: general construction, mechanical/HVAC, plumbing and electrical.
Description: On 2026-01-21 the Mission & Installation Contracting Command (MICC) Fort McCoy issued Presolicitation W911SA26BA003 for "New Contract - Construct Lift Station at South Post Housing." The procurement is a Service-Disabled Veteran-Owned Small Business (SDVOSBC) set-aside under NAICS 236220 (Commercial and Institutional Building Construction) and is anticipated to be a fixed-price construction contract. The official posting is available on SAM.gov and the Department of Defense’s PIEE solicitation module (PIEE link), and as of 2026-01-22 the notice remains a presolicitation with no public bid deadline; the page shows an archive date of 2027-01-21.
FireDepartment · WI, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
Special DistrictNY
Posted
Sep 5, 2026
Nov 6, 2026
Construct a new fire station of approx. 10,664 SF with associated site work. four (4) bid packages: general construction, mechanical/HVAC, plumbing and electrical.
CountyKS
Posted
-
Oct 6, 2026
Execution requirements for cutting and patching structural, operational, visual, and other construction elements; site survey layout, field engineering, substrate testing, and utility relocations for the construction of EMS Post #1.
Posted
Jun 18, 2026
Oct 5, 2026
Upgrades to the South Black Cat Lift Station consisting of a pump upgrade including a new complete sewage pump; couplings; pipes; spools; gaskets; resetting drain and air valve piping; resetting volute air purge system; valves; fittings; modifications to existing pipe supports and pump pedestals; electrical upgrade including electrical connections; power supply systems; electrical control and instrumentation equipment; wire; raceways; fixtures; conduit; calibration; integration with existing power and control systems; new output filter; electrical drives; SCADA integration
CitySC
Posted
-
Aug 27, 2027
This is a construction procurement for a qualified and licensed general contractor to provide the labor, materials, equipment, supervision, permitting, and construction services needed for Fire Station 82. The project is a turnkey new fire station at 801 Village Drive in Okatie, South Carolina, including associated site improvements and compliance with plans, specifications, codes, and regulations. It uses a design-bid-build delivery method, has an estimated construction cost range of $5,000,000 to $10,000,000, and is an active contract opportunity rather than a grant program.