Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide new ambulance financing services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide new operations building.
Posted Date
Sep 24, 2025
Due Date
Feb 3, 2026
Release: Sep 24, 2025
Close: Feb 3, 2026
Provide new operations building.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The East Orange Board of Education is soliciting bids for lease purchase financing for a Ford Transit 350 XL Passenger Van Low Roof 148WB AWD, with a total principal amount of $52,340.00.
Posted Date
Feb 5, 2026
Due Date
Feb 5, 2026
Release: Feb 5, 2026
Close: Feb 5, 2026
The East Orange Board of Education is soliciting bids for lease purchase financing for a Ford Transit 350 XL Passenger Van Low Roof 148WB AWD, with a total principal amount of $52,340.00.
AvailableThe City of Allentown is soliciting proposals from qualified lenders to provide financing for the acquisition of a milling machine. Respondents must propose financing terms (e.g., rates, repayment schedules, fees) suitable for the equipment purchase. Submissions are due via the City’s Public Purchase portal by the listed due date and time.
Posted Date
Dec 31, 2025
Due Date
Jan 28, 2026
Release: Dec 31, 2025
Close: Jan 28, 2026
The City of Allentown is soliciting proposals from qualified lenders to provide financing for the acquisition of a milling machine. Respondents must propose financing terms (e.g., rates, repayment schedules, fees) suitable for the equipment purchase. Submissions are due via the City’s Public Purchase portal by the listed due date and time.
AvailableConstruction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
Posted Date
Nov 13, 2025
Due Date
Jan 29, 2026
Release: Nov 13, 2025
Close: Jan 29, 2026
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →