Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide chilled beam corrective work. Mechanical contractor shall perform a detailed walk-through field inspection, to review the existing structures and premises, to determine all existing conditions, equipment/ductwork/piping
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.
Posted Date
Aug 18, 2025
Due Date
Jan 14, 2026
Premium
Access the largest public sector contact database
Close: Jan 14, 2026
Work consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.
AvailableProcurement of services for underground storage tank and VCC corrective action at two specified locations in South Carolina.
Posted Date
Dec 10, 2025
Due Date
Jan 21, 2026
Release: Dec 10, 2025
Close: Jan 21, 2026
Procurement of services for underground storage tank and VCC corrective action at two specified locations in South Carolina.
AvailableSeeking qualified contractors to provide labor, materials, and services for the replacement of potable and chilled water systems, as well as drain line work, at freeport police; Potable Water System: Install new PEX piping to service all plumbing fixtures. Demo and remove existing water piping. Chilled Water System: Install new pre-insulated HDPE chilled water piping system; Replace drain piping with SCH 40 PVC pipe and fittings. Replace and reroute hot and cold-water lines behind the jail cell with 2-inch PEX pipe and fittings.
Posted Date
Oct 3, 2025
Due Date
Jan 8, 2026
Release: Oct 3, 2025
Close: Jan 8, 2026
Seeking qualified contractors to provide labor, materials, and services for the replacement of potable and chilled water systems, as well as drain line work, at freeport police; Potable Water System: Install new PEX piping to service all plumbing fixtures. Demo and remove existing water piping. Chilled Water System: Install new pre-insulated HDPE chilled water piping system; Replace drain piping with SCH 40 PVC pipe and fittings. Replace and reroute hot and cold-water lines behind the jail cell with 2-inch PEX pipe and fittings.
AvailableWork includes to design and install new HVAC systems that will include chilled water cooling.
Posted Date
Jul 29, 2025
Due Date
Apr 2, 2026
Release: Jul 29, 2025
Close: Apr 2, 2026
Work includes to design and install new HVAC systems that will include chilled water cooling.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis