Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking qualified contractors to provide labor, materials, and services for the replacement of potable and chilled water systems, as well as drain line work, at freeport police; Potable Water System: Install new PEX piping to service all plumbing fixtures. Demo and remove existing water piping. Chilled Water System: Install new pre-insulated HDPE chilled water piping system; Replace drain piping with SCH 40 PVC pipe and fittings. Replace and reroute hot and cold-water lines behind the jail cell with 2-inch PEX pipe and fittings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes chiller replacement.
Posted Date
Oct 20, 2025
Due Date
Dec 30, 2025
Release: Oct 20, 2025
Close: Dec 30, 2025
Work includes chiller replacement.
AvailablePremium
Access the largest public sector contact database
Furnishing of open-ended plumbing repairs and maintenance services as required at various locations throughout the township.
Posted Date
Oct 20, 2025
Due Date
Dec 19, 2025
Release: Oct 20, 2025
Close: Dec 19, 2025
Furnishing of open-ended plumbing repairs and maintenance services as required at various locations throughout the township.
AvailableProvide main plumbing line work.
Posted Date
Nov 14, 2025
Due Date
Jan 12, 2026
Release: Nov 14, 2025
Close: Jan 12, 2026
Provide main plumbing line work.
AvailableRemoval and replacement of existing ice chiller equipment utilized in the preparation of ice skating rink surface ice. Removal and replacement of ice melting coil in the snow melting pit. Removal and replacement of ice melting coil in the snow melting pit. Installation of new heating and ventilation equipment to provide proper ventilation of the ice equipment room.
Posted Date
Oct 17, 2025
Due Date
Dec 12, 2025
Release: Oct 17, 2025
Close: Dec 12, 2025
Removal and replacement of existing ice chiller equipment utilized in the preparation of ice skating rink surface ice. Removal and replacement of ice melting coil in the snow melting pit. Removal and replacement of ice melting coil in the snow melting pit. Installation of new heating and ventilation equipment to provide proper ventilation of the ice equipment room.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis