Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of McMinnville is seeking professional engineering services to develop alternative improvement concepts, prepare conceptual plans, provide design services at 30%, 60%, and 90% stages, and produce final bid-ready drawings and specifications to upsize parallel 21-inch sanitary sewer lines and replace/rehabilitate an adjacent 48-inch brick-lined storm sewer. The work requires multidisciplinary engineering expertise including civil, geotechnical, surveyor, sewage collection/treatment/disposal, and structural engineering.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project involves sanitary and storm sewer point repairs including but not limited to: sanitary and storm sewer excavation point repairs; replacement of wye and lateral pipe; mh installation; location and adjustment of buried sanitary and storm sewer manholes; invert replacement; cctv verification of the repair locations; and the post repair nassco CCTV.
Posted Date
Jan 15, 2026
Due Date
Feb 4, 2026
Release: Jan 15, 2026
Close: Feb 4, 2026
This project involves sanitary and storm sewer point repairs including but not limited to: sanitary and storm sewer excavation point repairs; replacement of wye and lateral pipe; mh installation; location and adjustment of buried sanitary and storm sewer manholes; invert replacement; cctv verification of the repair locations; and the post repair nassco CCTV.
The Village of Downers Grove is soliciting competitive bids for the 2026 Storm Sewer Replacement project, including construction of new storm sewer and related structures, street resurfacing at Lincoln St and Middaugh Ave, and installation of two storm manholes and storm sewer at 1051 Candlewood. Electronic plan documents and bid specifications are provided through the buyer's plan-room and bidders must provide a 5% bid bond. The solicitation (Call for Bids CFB-5-0-2026/WS, Project SW-070) was posted 2026-01-28 and is scheduled to close on 2026-02-11, and is not a grant.
Posted Date
Jan 28, 2026
Due Date
Feb 11, 2026
Release: Jan 28, 2026
Close: Feb 11, 2026
The Village of Downers Grove is soliciting competitive bids for the 2026 Storm Sewer Replacement project, including construction of new storm sewer and related structures, street resurfacing at Lincoln St and Middaugh Ave, and installation of two storm manholes and storm sewer at 1051 Candlewood. Electronic plan documents and bid specifications are provided through the buyer's plan-room and bidders must provide a 5% bid bond. The solicitation (Call for Bids CFB-5-0-2026/WS, Project SW-070) was posted 2026-01-28 and is scheduled to close on 2026-02-11, and is not a grant.
Scope consist of approx 12,000 LF of CCTV inspection of Sanitary Sewer; 500 LF of Sanitary lateral Televising; 200 LF of exploration Trench; 7,100 LF of CCTV inspection of Storm Sewer.
Posted Date
Jan 15, 2026
Due Date
Feb 4, 2026
Release: Jan 15, 2026
Close: Feb 4, 2026
Scope consist of approx 12,000 LF of CCTV inspection of Sanitary Sewer; 500 LF of Sanitary lateral Televising; 200 LF of exploration Trench; 7,100 LF of CCTV inspection of Storm Sewer.
Interceptor sanitary sewer line replacement.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
Close: Feb 12, 2026
Interceptor sanitary sewer line replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis