NDDOT's final 2026-2029 STIP lists a fiscal-year-2026 thin overlay from JCT I-29 E to Red River.
See sourceHide source
Fiscal Year: 2026 Rural NIAGRA E TO 1.4 MILES W OF JCT ND 18 CPR, Grinding 5.3 MI E ND 1 TO MICHIGAN BYPASS CPR END PCC TO PAR ROAD Chip Seal Coat JCT I-29 TO RED RIVER Mill/Ol 2" Max
North Dakota Department Of Transportation Statewide Transportation Improvement Program 2026-2029
NDDOT's 2027 draft STIP lists PCN 24027 for 3.804 miles of ND 5 from JCT I-29 to the Red River as a proposed $1,365,928 preventive-maintenance asphalt-overlay project.
See sourceHide source
North Dakota Department of Transportation District - 6 - Grand Forks District PCN Fund Source Hwy CMC Dir Location Length (Miles) Investment Strategy Work type PE/RW/UTIL CON/CE Total Cost Fed Fund State Fund Local Fund Other Fund Fiscal Year : 2027 Bridge 24603 NH 5 E EAST OF LANGDON TO RED RIVER Structure Preservation,St ructure Rehabilitation BR Rail…
North Dakota Department of Transportation Statewide Transportation Improvement Program 2027-2030
Property demolition and debris cleaning. Complete removal and legal disposal of one (1) existing building structure located on a property approximately 1,800 acres in size. There will also be a second building that will be an optional tear down at the discretion of the NTMWD.
Work includes 2 ea of remove and dispose of existing manhole, abandon 8" sewer main, 2 ea of extend and re-connect existing sewer service, 30 lf of 8" sdr-26 gravity sewer main, 2 ea of connect 8" sdr-26 sewer main to existing vcp sewer main, 2 ea of core existing manhole and connect 8" sdr-26 sewer main w/ interior drop, 2 ea of bench and invert rehab, 45 vf of epoxy (or alternate) manhole lining, 48" dia structure, 2 ea of remove existing manhole and replace with 48" id castin place, unpaved, 1 ea of remove existing manhole and replace with 48" id castin place, paved, bypass pumping for manhole rehabilitation and replacement. See attached file.
Kansas Department of Transportation seeks bids for milling and hot-mix asphalt overlay on 8.972 miles of US-54, from Kingman East CL to the K-14 junction in Kingman County. The contract is Proposal 526112525 (U054-048 KA 8136-01 / ACNHP-A813(601)) and requires completion within 75 contract days, including 55 restricted days. Bids must be submitted electronically through Bid Express by 1:00 p.m. local time on November 18, 2026.