CountyNY
May 27, 2026
Closes
Aug 13, 2026
NCWD GI Partial Roof and WTP Generator Gutter *REBID*
Work includes approx 1 LS replacing GI partial roof and related work; 1 Ls replacing the WTP generator gutter and related work.
Description: The Niagara County Water District is soliciting sealed bids from contractors for Contract No. 26-1R, the GI Partial Roof and WTP Generator Gutter Replacement (Wendel Project No. 31462606). The scope includes roof replacement at the Grand Island Pump Station and installation of new metal gutters, downspouts, snow guards and gutter guards with electrical connections for a heated gutter system at the Williams Road Treatment Plant generator building, plus an alternate for expansion joint replacement at two doghouse wall connections. Sealed proposals must be received by the Administrative Director Ms. Jennifer H. Bieber at the NCWD Service Center, 5450 Ernest Road, Lockport, New York, by 11:00 AM EDT on August 13, 2026, with project documents available on or after July 9, 2026 via the Avalon Plan Room.
SpecialDistrict · NY, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Niagara Falls Water Board.
Adjacent opportunities open for bidding right now.
CountyNY
May 27, 2026
Closes
Aug 13, 2026
Work includes approx 1 LS replacing GI partial roof and related work; 1 Ls replacing the WTP generator gutter and related work.
CountyNY
Jul 9, 2026
Closes
Aug 13, 2026
Work includes removing of existing roofing system in its entirety of ballast stone on EPDM membrane on insulation down to existing concrete deck. Removal of existing metal edge gravel stop. Remove and replace metal scuppers and downspouts. Provide new roofing system of a vapor barrier over existing concrete deck, rigid tapered insulation, cover board and SBS modified bituminous membrane. Including: A. Provide metal edge gravel stop at the top of perimeter walls. B. Provide SBS membrane flashing with termination bar at junction with existing wall and under louver sill. C. Remove and replace metal scuppers and downspouts. Treatment plant include new metal gutter and downspouts on east and west elevations with additional framing in soffit for gutter, new snow guard and gutter guard system with electrical connections for the new heated gutter system.
CityOH
Apr 14, 2026
Closes
Sep 3, 2026
This project is to include any and all labor, equipment, and materials necessary to partially demolish part of the poolhouse structure. Work shall include demolition and removal of site improvements, abandonment and removal of below-grade construction, and the construction of new work to leave in place a single utility room servicing the adjacent splash park.
CountyNE
May 13, 2026
Closes
Aug 19, 2026
Work includes all necessary actions to deliver fully functional, automated backup power systems, including-but not limited to-the procurement of generators and automatic transfer switches (ats), concrete construction, natural gas piping and boring, and electrical integration.