CityWA
Posted
Aug 20, 2026
Sep 24, 2026
Emergency Generators for Wells #1 and #6
Work primarily includes the installation of back-up power generators and Variable Frequency Drives at city-owned Wells #1 and #6.
Description: Work includes installation of plant #1 - #4 emergency generator: plant #1 250kw diesel generator, ats, mobilization, concrete pad, electrical improvements and fencing. Plant #2 250kw diesel generator, ats, mobilization, concrete pad, electrical improvements and fencing. Plant #3 125kw diesel generator, ats, mobilization, concrete pad, electrical improvements and fencing. Plant #4 150kw diesel generator, ats, mobilization, concrete pad, electrical improvements and fencing.
SpecialDistrict · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
CityWA
Posted
Aug 20, 2026
Sep 24, 2026
Work primarily includes the installation of back-up power generators and Variable Frequency Drives at city-owned Wells #1 and #6.
CityNY
Posted
Aug 28, 2026
Sep 22, 2026
This RFP is for the inspection, maintenance, and repair services for emergency generators located across various Essex County facilities and towns.
CityTX
Posted
Sep 14, 2026
Oct 1, 2026
Construction project includes the installation of three (3) warning sirens at various locations and associated appurtenances.
CityIA
Posted
Sep 15, 2026
Oct 29, 2026
Planned improvements shall include preliminary treatment building upgrades (mechanical screen replacement, grit equipment replacement, and HVAC improvements), primary clarifiers replacement, new primary sludge pumping station, new intermediate lift station, aeration tank rehabilitation and process improvements (conversion to three-stage), aeration blower replacement in a new secondary control building, replacement of existing final clarifier 1-4 mechanisms and structural rehabilitation and handrail replacement, new final clarifier construction, ras pump station replacement in a new secondary control building, rehab of one anaerobic digester for conversion to sludge storage, plant wide odor control to address odors from the headworks, primary clarifiers, intermediate lift station, and solids dewatering areas, new plantwide standby emergency power generator(s), new WWTP main switchgear replacement, new WWTP SCADA system upgrades, code related improvements for NFPA 820 and other safety related standards, demolition of unused WWTP structures and buildings (north primary clarifiers and associated pump houses, south primary clarifiers and associated pump houses, south headworks building and grit detritor system, gas conditioning building, pipe valve vault building, garage #1, garage #2, and storage building adjacent to the chlorine contact tanks) and related HVAC, plumbing, electrical, instrumentation, and site/civil improvements.