State AgencyCO
Aug 10, 2026
Closes
Sep 3, 2026
Navajo State Park Boat Ramp Resurfacing Phase 3 RFP
Work consists of furnishing and placing a reinforced concrete overlay over a portion of the existing concrete boat ramp. Includes 6,000 SF of perform surface prep - 80' wide x 75' long ramp area; 4,500 SF of furnish and place 6" reinforced concrete overlay on boat ramp - 60' wide x 75' long center area; 1,500 SF of furnish and place 6" reinforced concrete overlay on boat ramp - two each 10' wide x 75' long side walkways; 6,000 SF of Perform Cold Weather Concrete Heating.