CityNC
Posted
-
Sep 23, 2026
Construction of the Fallston Park - Phase II
Project includes the installation/construction of concrete paving, picnic shelter, utility work, and landscaping.
Description: The project generally includes improvements to park including the removal and replacement of wood border with rubber curb/border, poured rubber surfacing, supply and installation of play equipment, and the removal and replacement of an overhead door.
City · NJ, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Township of New Hanover.
Adjacent opportunities open for bidding right now.
CityNC
Posted
-
Sep 23, 2026
Project includes the installation/construction of concrete paving, picnic shelter, utility work, and landscaping.
Colorado State University Fort Collins
Higher EducationCO
Posted
Sep 9, 2026
Oct 7, 2026
Colorado State University is soliciting bids for the rebid of the IDRC Phase III chilled-water connection construction project. The university’s official construction procurement page identifies BidNetDirect as the platform for active construction solicitations and requires submissions through that platform. The solicitation was published on September 9, 2026, closes on October 7, 2026 at 12:00 PM MDT, and is a construction procurement rather than a grant program.
Virginia Department of Transportation
State AgencyVA
Posted
May 12, 2026
Oct 28, 2026
Sidewalk construction. Work includes clearing and grubbing; 413 CY of regular excavation; 150 Ton asphalt concrete; 403 LF of saw-cut asphalt concrete; 71 LF of combined curb and gutter; 229 LF of combined curb and gutter; 581 SY of 4" hydr cement concrete sidewalk; 94 SY of flexible pavement tie-in planing above 2"-4"; 1,115 SY of 0"-2" flexible pavement planing; 136 LF of 1" water service line; 2 Ea 1" water meter box and yoke; 9 LF of 6" sanitary service lateral connection; signage; pavement markings. See attached file.
CityTX
Posted
Nov 17, 2025
Sep 30, 2026
Work includes approx 2,940 LF temporary chain link fence; 4,132 LF organic filter tube; 1 Ls site grading; 1 LS playground area drainage; 1,145 SF concrete parking lot paving.