Summary
Work includes construction of a 40 FT span by 6 FT clear width prefabricated steel truss pedestrian bridge, reinforced concrete deck and abutments, approach steps and sidewalks, timber railings, electrical system and related work. Description: 4 EA of stump, rem, 6" to 18"; 3 CYD of masonry and conc structure, rem; 20 SYD of sidewalk, rem; 70 CYD of backfill, structure, CIP; 130 CYD of excavation, Fdn; 90 CYD of excavation, earth; 370 FT of erosion control, silt fence; 25 CYD of subbase, CIP; 1800 LB of reinforcement, steel; 30 CYD of substructure conc; 240 sq ft of reinforced conc deck; 1 EA of prefabricated pedestrian bridge, furn and erect. See attached file.