Open RFP

NARDUCCI LEARNING CENTER, TEMPORARY MODULAR TRAILER UNITS RFP

Description: The City of Providence, through Providence Public Schools, is requesting proposals from qualified Construction Managers for the procurement and installation of several temporary classrooms modular trailer units on the existing Narducci Learning Center site located at 110 Paul Street, Providence RI, 02904. The classrooms will temporarily house students until their new, permanent school building is ready for occupancy. The temporary trailers are to be active for the full academic calendar of 2027-28 year. The procurement is intentionally structured to allow sufficient time for product approval, procurement, delivery, installation and final acceptance. Scope / Purchase Description: - Design and fabrication of four double-wide modular trailer units in accordance with all specifications set forth in this RFP and all program requirements and applicable building codes. - Add Alternate: provide costs for one additional double-wide trailer. - All site clearance and site preparation work, including grading, tree and stump removal and relocation of power lines and underground utilities if required. - Finish grading and removal of all debris from the site. - All excavation work and construction of foundations in accordance with the plans and specifications set forth in this RFP (foundation approach to be evaluated by vendor). - Delivery of all modular trailer units and construction materials to the construction site. - Acquisition of all permits required for transportation of modular trailer units from the factory to the construction site, and acquisition of all building and use/occupancy permits. - All repairs and corrective work required by applicable warranties; complete installation and assembly of modular units; anchoring, skirting, ramps, stairs and related accessories. - Connection of all electrical, telecommunications, water and sanitary service; ongoing trailer maintenance and sewage holding-tank pump-out services; trailer removal at end of occupancy and site restoration following removal. - Initial rental/occupancy period: one year, with an optional second-year extension. Key technical requirements include: four classrooms (double-wide units), ADA-compliant single-stall bathroom in each classroom sized/fit for preschool-age children, Category-6 plenum-rated data cabling and camera data locations, HVAC (mini-split systems), fire protection per applicable laws, prewiring for electrical/plumbing/sewer/intercom/fire alarm, preferred helical pier foundation (not required), and compliance with Stretch Energy Code and applicable state/local building codes. The Construction Manager is responsible for full procurement, delivery, installation, site preparation, coordination with Owner/OPM and school operations, quality control, warranties, insurance and required reporting.

Buyer
Providence Public School District

SchoolDistrict · RI, US

Released
Nov 16, 2026
Closes
Dec 14, 2026(17 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts