CityAR
-
Closes
Aug 26, 2026
N. Davis St. Sidewalk Ext. (pea Ridge) (s)
The project includes construction of approximately 1,800 LFt of new concrete sidewalk. Associated curb and gutter, storm drain installation, paving, and retaining wall construction are also included.