Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project is part of the Local Road Improvement Program (LRIP). The project involves asphaltic concrete paving, pulverizing, pavement removal, shaping and grading, milling of asphaltic concrete, removal and replacement of concrete curb and gutter, structure rim adjustments, driveway transitions, storm inlet adjustments and rebuilds, removal and replacement of public water laterals, parking lot construction, and incidental construction. All work is included in a single prime contract.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
approximately 56,770 square yards of roadway milling and installation of 6,485 tons of HMA 9.5 M64 surface course grading and paving on Mill Road, various concrete improvements, removal and replacement of the wood retaining wall and other associated work.
Posted Date
Jan 21, 2026
Due Date
Feb 18, 2026
Release: Jan 21, 2026
Close: Feb 18, 2026
approximately 56,770 square yards of roadway milling and installation of 6,485 tons of HMA 9.5 M64 surface course grading and paving on Mill Road, various concrete improvements, removal and replacement of the wood retaining wall and other associated work.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Resurfacing of various roadways and addressing surface drainage concerns throughout the Township. The improvements include the milling and overlay as well as full depth pavement reconstruction of select roadways with hot mix asphalt 9.5M64 surface course and hot mix asphalt 19M64 base course, removal and replacement of deteriorated curb where directed, installation of ADA curb ramps and detectable warning surfaces, traffic striping, and the reconstruction of inlets and the installation of bicycle safe grates and Type 'N' ECO inlet castings as required by the Tier "A" Municipal Stormwater Regulations, and stormwater management improvements as required.
Posted Date
Jan 25, 2026
Due Date
Feb 18, 2026
Release: Jan 25, 2026
Close: Feb 18, 2026
Resurfacing of various roadways and addressing surface drainage concerns throughout the Township. The improvements include the milling and overlay as well as full depth pavement reconstruction of select roadways with hot mix asphalt 9.5M64 surface course and hot mix asphalt 19M64 base course, removal and replacement of deteriorated curb where directed, installation of ADA curb ramps and detectable warning surfaces, traffic striping, and the reconstruction of inlets and the installation of bicycle safe grates and Type 'N' ECO inlet castings as required by the Tier "A" Municipal Stormwater Regulations, and stormwater management improvements as required.
AvailableRelease: -
Close: Feb 10, 2026
State AID road resurfacing program
AvailableThe City of Aurora, Illinois seeks qualified engineering consultants to provide professional services for the Bilter Road Highway Safety Improvement Program (HSIP), covering Bilter Road from the Illinois Prairie Path to the I-88 westbound ramps. The project has federal funding for construction and some engineering phases with an estimated construction cost of $1,530,000, requiring a qualification-based selection process. The solicitation was posted on January 29, 2026, and remains open for sealed responses until February 24, 2026.
Posted Date
Jan 29, 2026
Due Date
Feb 24, 2026
Release: Jan 29, 2026
Close: Feb 24, 2026
The City of Aurora, Illinois seeks qualified engineering consultants to provide professional services for the Bilter Road Highway Safety Improvement Program (HSIP), covering Bilter Road from the Illinois Prairie Path to the I-88 westbound ramps. The project has federal funding for construction and some engineering phases with an estimated construction cost of $1,530,000, requiring a qualification-based selection process. The solicitation was posted on January 29, 2026, and remains open for sealed responses until February 24, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →