Retrieving RFP details
Release
Close
City of Murfreesboro
Work includes implementation of adaptive signal control technology and proposed fiber cable. Project also includes ADA upgrades and pedestrian amenities at four intersections.
Borough of West Reading
Traffic signal improvements i.e., traffic signal controller assemblies, traffic signal vehicular signals, signal cabling, controller timing adjustments, and other construction elements associated with traffic signals.
City of Bakersfield
Work includes installation of adaptive controllers, fiber optic cable, modems, networking equipment, monitoring cameras, other fiber optic equipment, and surge suppression equipment.
City of Gallatin
Work includes, 1 LS construction stakes, lines, and grades; 3 EA removal of existing sign post; 120 SF street name sign (rigid 0.100" thick); 476 LF plastic pavement marking; 5 EA concrete foundation removal; 1 EA electrical service connection; 425 LF conduit 2" diameter (directional bore); 60 LF conduit 3" diameter (PVC schedule 80); 2 EA vehicle detector (radar- advance); 0.2 unit seeding.
Township of Exeter
Scope of work generally includes traffic signal improvements i.e., traffic signal controller assemblies, traffic signal vehicular signals, signal cabling, controller timing adjustments, and other construction elements associated with traffic signals. Work includes 1 LS of mobilization; 4 EA of controller modification, controller upgrade, econolite cobalt; 36 LF of backplate retrofit; 3 LF of video detection system; 2 EA of radar detection system, two approaches; 1 EA of radar detection system, one approach.
Release
Jan 07, 2025
Close
Jan 28, 2025