Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide installation of new warning devices and crossing surface for various railroads.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes: HVAC Upgrades at Cunningham Middle School: Controls upgrade, replace 4 AHU's, Replace DX Coil & Condenser, install 13 VFD’s and replace 6 hydronic cooling system pumps. North Shore Middle School roof restoration: install a flute fill ISO, coverboard, and 60mil. felt back PVC roof system with decor ribs to simulate standing seam, new gutters, downspouts, and associated metal, minor repairs to coping cap at low slope roof areas. Cunningham roof restoration: cap new modified bitumen over existing roof membrane and associated metal. Both roofs to extend 20 year NDL warranty.
Posted Date
Dec 7, 2025
Due Date
Jan 12, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 12, 2026
Work includes: HVAC Upgrades at Cunningham Middle School: Controls upgrade, replace 4 AHU's, Replace DX Coil & Condenser, install 13 VFD’s and replace 6 hydronic cooling system pumps. North Shore Middle School roof restoration: install a flute fill ISO, coverboard, and 60mil. felt back PVC roof system with decor ribs to simulate standing seam, new gutters, downspouts, and associated metal, minor repairs to coping cap at low slope roof areas. Cunningham roof restoration: cap new modified bitumen over existing roof membrane and associated metal. Both roofs to extend 20 year NDL warranty.
AvailableNetwork upgrades to include the addition of network switches and associated network gear.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Network upgrades to include the addition of network switches and associated network gear.
AvailableThis RFP is for a vendor to design, procure, and install playgrounds with Engineered Wood Fiber (EWF) surfacing at two City parks.
Posted Date
-
Due Date
Jan 3, 2026
Release: -
Close: Jan 3, 2026
This RFP is for a vendor to design, procure, and install playgrounds with Engineered Wood Fiber (EWF) surfacing at two City parks.
AvailableFY2026 - SM Fibers and Racks Upgrades.
Posted Date
Nov 28, 2025
Due Date
Jan 13, 2026
Release: Nov 28, 2025
Close: Jan 13, 2026
FY2026 - SM Fibers and Racks Upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →