Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide basin/stormwater retrofit.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Services of a qualified General Contractor for the retrofit and conversion of Stormwater Facility JC77 from a Level I Wet Pond to a Level II Wet Pond.
Posted Date
Jan 23, 2026
Due Date
Feb 26, 2026
Release: Jan 23, 2026
Close: Feb 26, 2026
Services of a qualified General Contractor for the retrofit and conversion of Stormwater Facility JC77 from a Level I Wet Pond to a Level II Wet Pond.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project will disconnect existing storm drain outfalls from the piped portion of the No. 1 Canyon Drain (NOCD) system located in Pershing Street between Springwater Avenue and Maple Street and improve stormwater controls with a collective of replacement storm drainage systems and roadway infrastructure repairs. Work will include the installation of a combined 2,037 LF of 12", 18", and 24" corrugated polyethylene pipe (CPEP) connected by 24 pre-cast concrete catch basins of various sizes. The project includes 642 LF of gravel infiltration trenches of differing widths and sizes of perforated CPEP. Four (4) premanufactured water quality filtration catch basins will be installed off-line to treat surface runoff directly prior to release to the new drainage systems. The base project also includes approximately 1,433 LF of 8" ductile iron water main replacement is also included in the work for this project. The NOCD within the subject area is a combination of 36-inch diameter CPEP and 48" corrugated metal pipe (CMP). An alternative additive project scope of work has been identified and may be included in the final contract to remove and replace two (2) approximately 30 LF damaged portions of 36" CPEP and to install a new cured-in-place pipe (CIPP) liner over approximately 1,066 LF of the existing 48" CMP portion of the NOCD.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
This project will disconnect existing storm drain outfalls from the piped portion of the No. 1 Canyon Drain (NOCD) system located in Pershing Street between Springwater Avenue and Maple Street and improve stormwater controls with a collective of replacement storm drainage systems and roadway infrastructure repairs. Work will include the installation of a combined 2,037 LF of 12", 18", and 24" corrugated polyethylene pipe (CPEP) connected by 24 pre-cast concrete catch basins of various sizes. The project includes 642 LF of gravel infiltration trenches of differing widths and sizes of perforated CPEP. Four (4) premanufactured water quality filtration catch basins will be installed off-line to treat surface runoff directly prior to release to the new drainage systems. The base project also includes approximately 1,433 LF of 8" ductile iron water main replacement is also included in the work for this project. The NOCD within the subject area is a combination of 36-inch diameter CPEP and 48" corrugated metal pipe (CMP). An alternative additive project scope of work has been identified and may be included in the final contract to remove and replace two (2) approximately 30 LF damaged portions of 36" CPEP and to install a new cured-in-place pipe (CIPP) liner over approximately 1,066 LF of the existing 48" CMP portion of the NOCD.
AvailableRehabilitate two existing stormwater basins. This will include clearing of brush and felling of trees along the fence line, repairs to the existing fence, replacement of existing outlet structures, installation of inlet snouts, installation of gravel access road and site restoration.
Posted Date
Jan 19, 2026
Due Date
Feb 9, 2026
Release: Jan 19, 2026
Close: Feb 9, 2026
Rehabilitate two existing stormwater basins. This will include clearing of brush and felling of trees along the fence line, repairs to the existing fence, replacement of existing outlet structures, installation of inlet snouts, installation of gravel access road and site restoration.
AvailableWork includes construction of stormwater detention basin (compartment 2).
Posted Date
Dec 19, 2025
Due Date
Feb 2, 2026
Release: Dec 19, 2025
Close: Feb 2, 2026
Work includes construction of stormwater detention basin (compartment 2).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →