Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work to be done under this contract includes: pavement maintenance, but not limited to approx. 10,594 SY of milling, 1787 tons of asphalt surfacing, 875 SY of 8" and 10" concrete pavement (5k) to be overlaid, 4180 SY of 6", 8" and 10" concrete pavement (5k), 467 SY of sidewalks and sidewalk ramps, 5709 LF of concrete curb and gutter, and pavement markings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Lawrence is soliciting bids for ‘2026 Street Maintenance - Phase 1’ (MS6-M26001), consisting of milling and overlay, microsurfacing, pavement patching, installation of sidewalk ramps, minimal concrete replacements, and related street maintenance across various locations in the city. The solicitation was posted on 2026-01-14 and has a response deadline of 2026-02-03; the estimated value range is approximately $1.5M–$3.0M. Work has area-specific scheduling requirements (e.g., Area 2 work not to begin until after July 15, 2026 and coordination around the Douglas County Fair) and requires bidders to follow the construction plans and contract documents available from the City procurement portal.
Posted Date
Jan 14, 2026
Due Date
Feb 3, 2026
Release: Jan 14, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 3, 2026
The City of Lawrence is soliciting bids for ‘2026 Street Maintenance - Phase 1’ (MS6-M26001), consisting of milling and overlay, microsurfacing, pavement patching, installation of sidewalk ramps, minimal concrete replacements, and related street maintenance across various locations in the city. The solicitation was posted on 2026-01-14 and has a response deadline of 2026-02-03; the estimated value range is approximately $1.5M–$3.0M. Work has area-specific scheduling requirements (e.g., Area 2 work not to begin until after July 15, 2026 and coordination around the Douglas County Fair) and requires bidders to follow the construction plans and contract documents available from the City procurement portal.
AvailableThe work to be performed under this contract consists of comprehensive street and sidewalk improvements at multiple locations throughout the city. The project scope includes select curb and gutter replacements, sidewalk and ADA ramp upgrades, concrete pavement installation and patching, partial and full-depth asphalt pavement patching, microsurfacing, and a 2" mill and overlay with new pavement markings. Major quantities include approx. 28,000 SY of milling, 3,000 tons of asphalt, 14,000 SY of microsurfacing, 11,000 LF of curb and gutter , and 1,100 SF of ADA ramps.
Posted Date
Jan 7, 2026
Due Date
Jan 27, 2026
Release: Jan 7, 2026
Close: Jan 27, 2026
The work to be performed under this contract consists of comprehensive street and sidewalk improvements at multiple locations throughout the city. The project scope includes select curb and gutter replacements, sidewalk and ADA ramp upgrades, concrete pavement installation and patching, partial and full-depth asphalt pavement patching, microsurfacing, and a 2" mill and overlay with new pavement markings. Major quantities include approx. 28,000 SY of milling, 3,000 tons of asphalt, 14,000 SY of microsurfacing, 11,000 LF of curb and gutter , and 1,100 SF of ADA ramps.
AvailableThis project includes roadway resurfacing, curb and sidewalk maintenance, and related work.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
This project includes roadway resurfacing, curb and sidewalk maintenance, and related work.
AvailableThe City of Akron is soliciting proposals for the Resurfacing and Miscellaneous Paving 2026 Phase 2 project to resurface approximately 24 centerline miles of streets across the city. The scope includes asphalt surface removal, manhole and valve box adjustments, intermediate and surface course paving, underdrain installation, subbase replacement and railroad coordination as directed by the Engineer; period of performance completion is set for October 31, 2026. The solicitation opened Jan 20, 2026 and closes Feb 12, 2026 at 11:00 AM EST; RFP volumes, proposal form, and supporting documents are posted on the City’s Bonfire portal (account required to download attachments).
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
The City of Akron is soliciting proposals for the Resurfacing and Miscellaneous Paving 2026 Phase 2 project to resurface approximately 24 centerline miles of streets across the city. The scope includes asphalt surface removal, manhole and valve box adjustments, intermediate and surface course paving, underdrain installation, subbase replacement and railroad coordination as directed by the Engineer; period of performance completion is set for October 31, 2026. The solicitation opened Jan 20, 2026 and closes Feb 12, 2026 at 11:00 AM EST; RFP volumes, proposal form, and supporting documents are posted on the City’s Bonfire portal (account required to download attachments).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →