CountyMA
Jul 22, 2026
Closes
Aug 18, 2026
Parking Lot Reconstruction RFP
Reconstruction of parking lot with drainage and lighting components.
Description: Parking lot refresh for rr450. Repair/fill cracks and seal approx 130k SF of parking lot and cracks. Includes: cleaning, filling, smoothing and sealing.
Federal · FL, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Procurement and program contacts connected to U.S. Special Operations Command (USSOCOM).
Adjacent opportunities open for bidding right now.
CountyMA
Jul 22, 2026
Closes
Aug 18, 2026
Reconstruction of parking lot with drainage and lighting components.
Wisconsin Department of Administration
State AgencyWI
Jul 31, 2026
Closes
Sep 16, 2026
In general, the work consists of: pulverizing existing asphalt pavement, removal of existing concrete driveway apron and sidewalks, spot remove and replace curb sections, construction of new parking area to subgrade, base grading, concrete sidewalk, and asphalt paving. Additionally, vehicle and pedestrian access gate removal and replacement with fencing, removal of fence sections, tree removal, outdoor luminaire replacement and restoration. See attached files and outside link.
Collin County Community College District
Higher EducationTX
Jul 31, 2026
Closes
Aug 18, 2026
Collin County Community College District is soliciting turnkey services to re-stripe its existing parking lots, including all necessary materials and workmanship. The contract will run for three years from November 1, 2026, through October 31, 2029, with services generally performed annually and potentially requested on an as-needed basis. The solicitation is posted and responses are due August 18, 2026, at 3:00 PM.
Plymouth (City Of) Housing Authority
Special DistrictWI
Jul 31, 2026
Closes
Aug 19, 2026
Demolition of the existing asphalt wear layer at the south and north parking lots and potions of their existing drives per plans. Work to include storm sewer structures work at two central catch basins and 2" curb catch basins to raise to align with the new finished asphalt and/or new concrete curb sections. New parking and ADA striping, and post signage per state and local ordinances.