Open RFPMP200 Emergency Power Equipment Replacement RFP
Description: This project will replace the obsolete emergency power system at 200 medical plaza (mp200), also known as the peter morton medical building. The project will include the removal, decommissioning, and replacement of two existing 1000 kw emergency diesel generators along with their associated controls. The existing load banks will also be removed and replaced with new resistive load banks sized to match the new generator capacity. To support the new equipment, the existing day fuel tank will be decommissioned and replaced, and the diesel exhaust treatment system will be upgraded to comply with current south coast air quality management district (scaqmd) requirements. In addition, seven automatic transfer switches (ats), the paralleling switchgear, and all associated conductors currently distributed throughout the building will be removed and replaced in their entirety. A new equipment platform will be constructed to support the generators, while temporary cabling routed into the b-level central plant and roof-level electrical room will be properly weatherproofed and fireproofed. The scope also includes modifications to the existing roof structure to accommodate new loads. This will require removal and replacement of the roof membrane, insulation, substrate, drains, and waterproofing in all areas affected by the work. An expansion of the existing roof opening will be carried out, including the installation of new structural framing to support a new roof hatch and ladder. Structural strengthening will be incorporated as required, along with new roof curbs for the equipment. Finally, the project will address the restoration of interior components impacted by construction, such as fire sprinkler systems, hvac components, ceiling finishes, wall and ceiling repairs, and painting. Ancillary components necessary for a complete, fully operational, and code-compliant system including new breakers for the paralleling switchgear, will also be replaced as part of the work. The abatement of hazardous materials is required. Mp 200 will be fully occupied by ucla at all times during construction. Cm/contractor shall demolish and legally dispose of the existing generators off university property. Generators will not be salvaged back to the university.